Published February 19, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Pella, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reconstruction and expansion of the Pella Middle School parking lot: work included but is not limited to 407 LF of RCP storm sewer, 11,703 SY of PCC Pavement, pavement, sidewalk, and storm sewer removal, and miscellaneous associated work including cleanup. See Bid Proposal for complete list of quantities. Provide the name, mailing address, email address, and telephone number of a contact person. Attach additional information as needed. This will be the address to which all correspondence will be sent and to which all questions will be directed NAME:Ryan Doschadis, PHONE 641-780-7926 Est. Value: $ 1,156,543.50 Work on the improvement shall be commenced any time after a written Notice to Proceed is issued, but not before approval of the contract by the School Board and be completed as stated below. A Notice to Proceed is expected to be issued on or about April 7, 2025. The contract shall be fully completed and ready for final payment no later than June 1, 2025. Liquidated damages in the amount of Seven Hundred Fifty Dollars ($750.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the District, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the District. The bid shall contain no condition except as provided in the specifications. The bid security should be made payable to the Pella Community School District. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the District as damages in the event the successful bidder fails or refuses to enter into a contract within thirty (30) days after the award of contract and post bond satisfactory to the District insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the Pella Community School District on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. The Pella Community School District reserves the right to reject any and all bids.

Bid Results

Sidewalks / Parking Lot

$1,156,544.00

Public - City

Paving, Site Work

10

8

6

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
38
Bidding Soon
693
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Pella Community School District Middle School Parking Lot Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.