BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work and paving for a mixed-use development in Columbus, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project involves street and / or utility work as described below: Base Bid A Brookside Lane (Avalon Road West to Cul-de-Sac)Reconstruction includes, but shall not be limited to, approximately 720 LF of urban section (36 feet face to face of curb) street reconstruction including stone base course removal, remove and replace approximately 560 tons of asphaltic pavement, remove and replace concrete curb and gutter, remove and replacement of concrete drive approaches, new concrete sidewalk; approximately 635 LF of 12-inch sanitary sewer, including manholes, service laterals, and miscellaneous appurtenances; approximately 1175 LF of 12-inch water main installation including valves, water services and miscellaneous appurtenances; approximately 208 LF of 24-inch storm sewer installation including inlets, and miscellaneous appurtenances; saw cutting; work zone traffic control and detour; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Bids must be accompanied by Bid security made payable to City of Columbus in an amount of 5% of BIDDER s maximum Bid price and in the form of a certified check, or an electronic Bid Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Bidder is required to upload a copy of the Bid security and deliver the original certified check or bid bond within 48 hours after close of bid to Ruekert & Mielke, Inc., Attn: Brian Toczyski, 4630 S. Biltmore Lane, Madison WI 53718 . Completion delays are subject to liquidated damages. The City of Columbus reserves the right to accept the most advantageous Bid, or to reject any and all Bids.Award of Work described herein is subject to the provisions of the Wisconsin Statutes. All Work is included in a single prime contract. The Work will be substantially completed on or before September 15, 2025 ; Final completion- October 1, 2025

Bid Results

Roads / Highways

$897,002.00

Public - City

Paving, Site Work

35

15

11

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
66
Bidding Soon
1,664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

March 17, 2025

Project location map

Multiple Locations, Columbus, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.