BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated October 9, 2025

Site work for a mixed-use development in Toledo, Ohio. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

This project is for the replacement of the existing playground at Romanoff Park. Work includes removal of the existing swing structure and plastic edging, excavation, installation of new concrete edging, installation of new play structure and drainage system as well as site restoration. Online Q&A Yes Q&A Deadline 02/05/2025 12:00 PM (EST) Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Project Duration 90 days

Bid Results

Playgrounds / Parks / Athletic Fields

$140,940.00

Public - City

Site Work

10

5

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
171
Bidding Soon
2,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 1, 2025

Project location map

949 Collins St, Toledo, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.