BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Demolition and site work for an educational facility in Durham, North Carolina. Completed plans call for the demolition of a 11,300-square-foot educational facility; and for site work for a educational facility.

**As of February 14, 2025 project not yet awarded.** Building 8 Demolition Building 8, located at 1628 E Lawson Street is a brick building built on concrete slab. The structure is approximately 11,300 Sq. Ft. The scope of work includes the demolition of the structure, as well as the slab. This demolition work is to include both the exterior and interior of the building. The existing traffic circle and curb at the building's entrance is to remain. Grade demolition area providing positive drain away from traffic circle/curb. Seed with fescue grass seed and straw disturbed areas. Removal of the infrastructure connecting BLDG 10 to BLDG 8 as part of the scope of work on the demolition of BLDG 8 through the Hand Hole that is on the Northeast corner of BLDG 10. Last Day for Questions will be: 02/04/25 12:00 PM Submit Questions to: Christian Arestegui Barba aresteguibarbac@durhamtech.edu Technical Specifications Building 8, located at 1628 E Lawson Street is a brick building built on concrete slab. The structure is approximately 11,300 Sq. Ft. The scope of work includes the demolition of the structure, as well as the slab. This demolition work is to include both the exterior and interior of the building. The existing traffic circle and curb at the building's entrance is to remain. Grade demolition area providing positive drain away from traffic circle/curb. Seed with fescue grass seed and straw disturbed areas. A. Demolition Guideline 1. The Contractor will coordinate and acquire all necessary permits to perform this work. Once permits are obtained, they will be posted on-site. 2. Owner will be notified at least 1 week prior to commencement of any workContractor to provide temporary fencing around perimeter of demolition, as agreed by the College. 4. Prior to demolition, Contractor is to survey building and report any concerns/issues to the owner. 5. Environmental survey has been completed for 1628 E. Lawson Street. A copy has been provided as part of this IBT. 6. Prior to demolition, the owner will relocate the building's chiller and generator. 7. Prior to demolition the owner will discontinue all utility services (including fiber/telecom, electrical, gas, water, and sewer.). Contractor to request cutoff date at least 2 weeks prior to commencement of work. 8. The removal of legacy copper and fiber data cabling that currently connect Building 8 to the campus infrastructure must be severed and removed from Building 8. There are 2 parts to this removal: Part 1: Removal of the approximate 340 linear ft of legacy copper and MM/SM fiber that runs from the MDF (8-109) through the pull box northeast of Building 10 Marked on the attached map and to the MDF of (10-101a). Part 2: Removal of the approximate 170 linear ft of legacy copper and MM/SM fiber that runs into MDF (8-109) from the pull box. This cable can be severed at the hand pull box embedded in the sidewalk Northeast of BLDG 10

Award

Educational

$76,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
136
Bidding Soon
1,633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

Project location map

1628 E Lawson St, Durham, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.