BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work and paving for a mixed-use development in Half Moon Bay, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of April 8 2025, the project was awarded to Half Moon Bay Grading & Paving Inc., with an awarded amount of $351,076.49.** Engineer's Cost Estimate: $282,382.80 In general, this project includes park improvements, parking improvements, and ADA improvements. Park improvements include, but not limited to, new swings, picnic tables, a new plaza, additional split rail fencing, drinking fountain, seat walls, a bulletin board, accent planting, bike racks, trash receptacles, and an ADA independent rider. Parking improvements include, ADA improvements, such as, but not limited to, altering the existing two (2) parallel parking stalls to three (3) angled parking stalls, one of which being an ADA van accessible parking stall. The work is to be complete within a period of 50 working days. Request for information on receiving bid packages or questions concerning the project should be directed to Project Manager/Engineer: Jonathan Woo, Assistant Engineer at the city Hall, 501 Main Street, by phone: (605) 726-8265, Fax: (650) 726-8261 or email: jwoo@hmbcity.com. Questions must be received by no later than Tuesday, February 11, 2025, at 5:00 P.M. All bids must include a bidder's bond or certified check for at least ten (10) percent of the total bid price including any additive items. Bonds or securities assuring faithful performance and payment for labour and materials in an amount of at least one hundred (100) percent of the contract amount, and insurance policies as required by the contract documents shall be furnished to the City upon execution of the contract. The City reserves the right to reject any and all bids and/or to waive any bid irregularity to the extent permitted by law.

Award

Playgrounds / Parks / Athletic Fields

$351,076.00

Public - City

Paving, Site Work

24

8

6

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
125
Bidding Soon
2,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 20, 2025

Project location map

608 Ruisseau Francais Ave, Half Moon Bay, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.