BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Site work and paving for a road / highway in Ridgeland, Mississippi. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 6, 2025, project was awarded to A. J. Construction, Inc., awarded amount is $663,290.80 As of March 20, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. construction of 1.433 miles of MAINTENANCE (OTHER THAN BRIDGE) on the Pear Orchard Road being known as State Aid Program (SAP) Project No. SAP-45(22)M in Madison County Mississippi. Mobilization 1.000 Ls Unclassified Excavation (Fm) 282.000 Cy Granular Material (Lvm), (Class 5, Group C) 84.000 Cy Hot Mix Asphalt Base Course, Bb-1 564.000 Ton Hot Bituminous Pavement Surface Course (Sc-1)(Type 8) 2,256.000 Ton Cold Milling of Bituminous Pavement, All Depths 27,334.000 Sy Roadway Construction Surveying 1.000 Ls Maintenance of Traffic 1.000 Ls Additional Construction Signs 0.000 Sf 6" Wide Thermoplastic Traffic Stripe (Skip White) (90 Mils) 0.037 Mi 6" Wide Thermoplastic Edge Stripe (Continuous White) (60 Mils) 2.896 Mi 6" Wide Thermoplastic Traffic Stripe (Continuous Yellow) (90 Mils) 11,838.000 Lf Thermoplastic Detail Stripe (4 " Equivalent Length) (White) (60 Mils) 4,263.000 Lf Thermoplastic Detail Stripe (4 " Equivalent Length) (Yellow) (60 Mils) 3,473.000 Lf Thermoplastic Legend (White) (120 Mils) 1,035.000 Lf Thermoplastic Legend (White) (120 Mils) 674.000 Sf Red-clear Reflective High Performance Raised Markers 36.000 Ea Two-way Yellow Reflective High Performance Raised Markers 161.000 Ea Vehicle Loop Assemblies 2,916.000 Lf Each bidder submitting a bid electronically as a PDF file shall include its Certificate of Responsibility Number as part of its PDF electronic bid submittal. Any electronic PDF bid that does not include the bidder's Certificate of Responsibility Number shall not be considered. Contract time: 90 working days Plans and Specifications Are on File in the Office of the Chancery Clerk of Madison County, John Mckee, the State Aid Engineer's Office and the Office of the State Aid Engineer, 412 E. Woodrow Wilson Avenue, Jackson, Mississippi. This Project Shall Be Constructed in Accordance With the Latest Edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. The Board of Supervisors hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement; minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Certified Check or Bid Bond for Five Percent (5%) of the Total Bid, Made Payable to Madison County and the State of Mississippi Must Accompany Each Proposal.

Award

Roads / Highways

$663,290.00

Public - County

Paving, Site Work

13

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 7, 2025

Project location map

S Pear Orchard Rd, Ridgeland, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.