Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated April 1, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Mound City, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of March 5, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Demolition of an existing structure and the construction of a new 188-foot clear span Prestressed Concrete NU-Girder Bridge. Guardrail, riprap and erosion control will be installed with minor roadwork and any incidental work in accordance with plans and specifications. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7 days prior to bid opening. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The Holt County Commission reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 5%. No 2nd tier subcontracting will be allowed on this project MO DOT - Lincoln Road Bridge Replacement

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

29

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
79
Bidding Soon
933
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

April 21, 2025

Project location map

Lincoln Rd, Mound City, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed