BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a civil project in Perry, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.

Counties: Taylor Road Name: SR 55 (US 221) Limits: At Two Pines Creek Bridge No 380011 and at Woods Creek Bridge No 380009 Project(s): 44261015201(*) Federal Aid No: D224091B Project(s): 44514715201 Federal Aid No: D224074B Total Roadway Length: 0.436 Miles Total Bridge Length: 0.034 Miles Total Proposal Length: 0.470 Miles Contract Days: 450 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Please read the full advertisement Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail, bridges and other incidental construction along SR 55 (US 221) at Two Pines Creek (Bridge No. 380011) and Woods Creek (Bridge No. 380009) in Taylor County. Question Deadline 02/19/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 009 - Minor Bridge Replacement - SR 55 (US 221)

Award

Bridges / Tunnels

$13,809,124.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
38
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 28, 2025

Project location map

FL-55, Perry, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.