Site work and new construction of a transportation facility in Perry, Florida. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
The project consists of providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Construction of a new AvGas fuel farm with concrete foundation, 15,000-gallon AvGas tank, fuel system equipment, incorporation into existing self-serve terminal, and site improvements. The contract time for substantial completion of the Base Bid work shall be 180 calendar days from the date of the "Notice to Proceed (NTP)." The final project completion shall be 210 calendar days from the date of the "Notice to Proceed (NTP)". Additional days will be awarded if additional alternates are awarded. Bid security in the amount of at least five percent (5%) of the total quote must be submitted with the quote. The quote security may be either a certified check or a proposal guaranty bond executed by a surety company authorized to do business in the State of Florida. Quote security shall be made payable to Taylor County BOCC. The successful contractor must be able to furnish proof of required insurance, a 100% Performance Bond, and a 100% Labor and Materials Payment Bond, and shall begin execution of this contract within five (5) calendar days following the date of the Notice to Proceed. Funding for this project is being provided by the Florida Department of Transportation and will be subject to all applicable requirements of the U.S. Department of Transportation grant assurances. The successful contractor will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 21, 1968 and published in the Federal Register (41CFR Part 60-1, 33 F.2 7804). Wages paid to employees must comply with the minimum established by the U.S. Department of Labor Wage Determination. The successful contractor must comply with the Davis-Bacon Act, Copeland Act (Anti-Kickback Act), the Occupational Safety and Health Act, the Contract Work Hours and Safety Standards Act (CWHSSA), Title VI of the Civil Rights Act of 1964 and Executive Order 11246. Taylor County has an approved Disadvantaged Business Enterprise (DBE) Program for Airport Improvement Program projects which the successful contract must comply with. The DBE participation goal for this project is 4.78% and compliance requirements are listed in the project documents. The Taylor County Board of County Commissioners reserves the right, it its sole and absolute discretion, to reject, to cancel, or withdraw this bid at any time and waive any irregularities in the bid process. The County reserves the right to award any contract to the respondent to which it deems to offer the best overall service; therefore, the County is not bound to award any contract based on the lowest quoted price. The County, in its sole and absolute discretion, also reserves the right to waive any minor defects in the process and to accept the bid deemed to be in the County's best interest. No faxed Proposals will be accepted. All bids should be addressed as follows: BID ENCLOSED: AVGAS FUEL FARM REPLACEMENT PERRY FOLEY AIRPORT Taylor County Board of County Commissioners Attention: Clerk's Office 1st Floor Courthouse 108 North Jefferson Street, Suite 102 Perry, Florida 32347 The project shall generally includes removal and replacement of concrete joints, removal and replacement of damaged concrete pavement, pavement markings, and other miscellaneous concrete rehabilitation work. Question Deadline 03/21/2025 All questions about the meaning or intent of these Bidding Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed, faxed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered
Award
Transportation Terminals
$899,348.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
481 Industrial Dr, Perry, FL
Related To This Project
Perry, FL
Bid Date: Apr 08 2025
Perry, FL
Bid Date: Apr 18 2025
Perry, FL
Bid Date: Apr 10 2025
Perry, FL
Bid Date: Apr 25 2025
Perry, FL
Bid Date: May 16 2025
Perry, FL
Bid Date: Jul 03 2025
Perry, FL
Bid Date: Mar 04 2025
Perry, FL
Bid Date: Feb 26 2025
Perry, FL
Bid Date: Feb 14 2025
Perry, FL
Bid Date: Feb 14 2025
Perry, FL
Bid Date: Jan 30 2025
Perry, FL
Bid Date: Dec 17 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.