BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Demolition, site work and addition to a civil project in Bradenton, Florida. Conceptual plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

This project involves the addition of a new water treatment basin, including all required appurtenances, materials, and equipment (referred to as Basin D). This will also include needed transfer pump capabilities to the Ground Storage Tanks. The existing Basin(s) will be modified to allow for the treatment of additional groundwater through piping upgrades. Exact capacity needs to be determined during the design phase, but anticipated to be in the 30-60MGD range. The project includes engineering, design, and construction of the new facilities. Additionally, the high service pump station at the Water Treatment Plant (WTP) will be expanded, including the installation of two (2) new 8,500 GPM (12.3 MGD) vertical turbine pumps with variable frequency drives (VFDs). This expansion will also incorporate all necessary electrical system components and SCADA integration. As of November 14, 2025, this project is included in the Manatee County FY 2025-2029 Capital Improvement Program (CIP). Construction is planned to start in October 2027 and end in March 2030. Engineer information has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$154,416,944.00

Public - County

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
165
Bidding Soon
2,193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2027

Project location map

17915 Water Line Srv Rd, Bradenton, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.