Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2025 at 7:00 PM
Updated March 5, 2025
Site work and new construction of a civil project in Altoona, Iowa. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Construction of Water Treatment Plant No. 4 with an initial rated capacity of 4 MGD and ultimate build out capacity of no less than 6 MGD, including administration and laboratory facilities; preconstruction services and procurement services seeking qualified construction subcontractors for specified Work packages Site work and utilities necessary to accomplish the Work. Improvements to new Well No. 5 and new Well No. 6. The CMAR Contract has an expected start date June 1, 2025, and duration for construction of approximately 36 months. Selection of the Construction Manager will be made using a two-step process. Step One: Owner will receive Statements of Qualification and evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner's consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for award of the CMAR Contract. Details regarding the selection criteria and the selection process are included in the Request for Qualifications. The scope of the CMAR Contract is summarized as follows: Project Scope: Construction of a new pressure filtration and ion exchange softening water treatment plant with an initial rated capacity of not less than 4 MGD located at 1500 Adventureland Drive NE. The project site is accessible off 14th Ave. NE, north of 9th St. NE. The project includes mass grading of the roughly 8.3-acre site, rough grading of future Adventureland Drive, and detailed site grading for the water treatment plant site including a stormwater detention. The new water treatment plant building is intended to be precast concrete panel construction and approximately 20,000 finished square feet. Additional site work at the water treatment plant includes raw water, finished water, stormwater, and sanitary sewer mains, electrical service connections, and communication connections, as well as site paving. The project scope also includes construction of a well house building at Well No. 5, located near the Sam Wise Park on at 1112 1st Street E. CMAR services will include Preconstruction Services, Procurement Services and will continue through the Construction phase of the project. The scope of services will include assistance to the Owner during the process of Pre-Construction and Construction. The EJCDC CMAR-525 (2023, Rev. 1) Agreement Between Owner and Construction Manager at Risk will be used
Post-Bid
Water / Sewer
$500,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2025
June 1, 2025
Multiple Locations, Altoona, IA
Related To This Project
Altoona, IA
Bid Date: Feb 25 2025
Altoona, IA
Bid Date: Feb 26 2025
Altoona, IA
Bid Date: Feb 26 2025
Altoona, IA
Bid Date: Feb 26 2025
Altoona, IA
Bid Date: Aug 08 2025
Altoona, IA
--
Altoona, IA
Bid Date: Apr 15 2025
Altoona, IA
Bid Date: Apr 08 2025
Altoona, IA
Bid Date: Jan 22 2025
Altoona, IA
Bid Date: Dec 17 2024
Altoona, IA
Bid Date: Dec 17 2024
Altoona, IA
Bid Date: Dec 10 2024
Altoona, IA
--
Altoona, IA
Bid Date: Nov 21 2024
Altoona, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
