Published February 6, 2025 at 7:00 PM

Updated February 14, 2025

Renovation of a water / sewer project in Whistler, British Columbia. Completed plans call for the renovation of a water / sewer project.

Quotation Documents and Technical Enquiries For enquiries, please contact: Chelsea Roberts, AScT Manager of Capital Projects, RMOW croberts@whistler.ca Quotation Submission Quotations shall be received by email to the address below. Resort Municipality of Whistler Email: engineerbids@whistler.ca The scope of work shall include the phases and tasks listed below. 1. Pre-Construction: a. Site confirmation of existing equipment, including dimensions and locations. b. Submission, at the beginning of the project, of a work schedule that covers the estimated timeline from award to completion. c. Submission of shop drawings for review of all equipment to be installed. d. Submission of shop drawings for review of the general configuration of piping and pipe supports. e. Mobilization to site. 2. Construction - General and Mechanical: a. Complete isolation of all sections of piping to be worked on. b. Disconnection and disposal of all replaced piping. c. Disconnection of all valves and other equipment, and it’s return to the RMOW public works yard. d. Provision and installation of all piping, and fittings, and couplings, as required to produce a complete system as described in the drawings and specifications. e. Provision and installation of all mechanical equipment as described in the drawings and specifications. f. Provision and installation of all gaskets, fittings and other peripheral items not explicitly shown or listed in the drawings and specifications but that are required to produce a complete system as described. 3. Construction – Electrical and Programming: a. Supply and install new RTU I/O card in existing RTU panel b. Contractor to coordinate with RTU programmer for shutdown of existing RTU for addition of new cards c. Supply and install all conduits, fittings, junction boxes and wiring to PRV and flowmeter d. Testing and Commissioning of new electrical components including PRV and flowmeter Work by Others: a. Programming of RTU 4. Post Construction: a. Flushing, disinfection and testing of all new piping equipment and assemblies to be completed per AWWA specifications prior to commissioning. b. Commissioning of the new equipment and piping as an integral part of the greater water system. c. Provide a set of accurate red-line drawings to be used to produce record drawings. d. Provide an operation and maintenance manual based on the new equipment installed. e. Provide a commissioning report for the PRV complete with all relevant “As Commissioned” data. f. De-mobilize from site.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Renovation

15

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
89
Bidding Soon
1,682
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 1, 2025

Project location map

3840 Sunridge Dr, Whistler, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.