Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2025 at 8:00 PM
Updated April 4, 2025
This is a service / maintenance or supply contract in Slave Lake, Alberta. Contact the soliciting agency for additional information.
Annual Contract Line Painting (2025) MATERIALS a) Paint and bead shall be supplied by the Contractor; b) Paint shall be a product approved for Alberta Infrastructure in the current year; c) Bead shall be a product approved for Alberta Infrastructure in the current year; d) All costs of shipping, handling, disposal of containers and storage shall be incidental to the contract. 2. EQUIPMENT a) The Contractor shall provide all equipment necessary for completion of the Work including but not limited to the painting truck, a pilot truck, a crash attenuator vehicle and all ancillary equipment such as forklifts, hoists, pumps and transport vehicles required to load, unload and transport the paint and glass beads b) Painting Truck The painting truck shall be self-propelled and equipped to meet or exceed the following requirements: (a) Two paint tanks each having a minimum capacity of 270 litres feeding three lines for a simultaneous two-colour application (two yellow directional dividing lines and one white. 3. WORK INCLUDED a) The Contractor will maintain records of daily production, accurate measurements of linear meters of line painted and quantities of paint and glass beads converted to application rates b) The pavement areas to be painted are detailed on the list above in 1.0 General, Location of Work c) No paint shall be applied on wet or dirty pavement; d) Wrongly applied markings must be removed at the contractor's expense by a method approved by the owner. e) Hours of work - all painting shall be done in daylight between 1/2 hour after sunrise and 1/2 hour before sunset; f) Operation of the painting machine against the flow of traffic shall not be permitted; g) The Contractor shall be solely responsible for any claims arising from paint splashed on private vehicles; h) The owner shall be responsible for all premarking required to properly apply markings; i) The owner shall be responsible for sweeping all pavement areas requiring sweeping before applying paint; j) The pilot truck shall be operated in accordance with Alberta Infrastructure practices; k) The Contractor shall protect the public from possible damage to vehicles in the form of wet paint being splashed on their vehicles from freshly painted markings; l) The Contractor shall be solely responsible for all claims arising from such occurrences and shall indemnify and save harmless the owner and its employees from and against all claims and demands. m) The Contractor shall ensure that all markings under this contract are on clean, dry, paved surfaces Markings applied over wet, sandy or dirty surfaces will not be accepted and shall be repainted at the Contractor's expense. n) Payment for centerline and edge line painting will be made at the unit price bid per km of road painted. This price will include all costs of inspections, transporting, supplying, applying paint and glass beads, signing, and supplying all labour; o) Payment for individual markings and symbols will be made at the unit price bid for each item, if applicable. p) The Contractor shall meet with the Chief Administrative Officer (CAO), or his representative, prior to the commencement of operations, to review and agree upon the proposed work plan and schedule. This will be done to ensure that critical portions of the work are completed on schedule and to reduce areas of conflict with traffic and other work projects. q) The proposed work plan will include a traffic accommodation plan and an environmental site plan. r) A pre-start up meeting is required to address safety items required from the successful company Estimated Contract Start Date Jun 1, 2025 Estimated Contract End Date Sep 30, 2025 Estimated Contract Duration 0 Year(s) 17 Week(s) 2 Day(s) *These estimated contract dates and duration are only estimates and subject to change. If you have questions, please contact the Contact Person below only by email. Contact Person Shari Spencer Asst Director of Field Services, Document Conveyance Manager Method of Contact Shari.Spencer@mdlsr.ca Address 3000, 15 Ave SE Slave Lake, Alberta Canada T0G 2A3 Questions must be submitted by email no later than - Feb 13, 2025 at 4:30 pm (MT)
Award
Roads / Highways
$35,982.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
June 1, 2025
Multiple Locations, Slave Lake, AB
Related To This Project
Slave Lake, AB
Bid Date: Apr 17 2025
Slave Lake, AB
Bid Date: Apr 24 2025
Slave Lake, AB
--
Slave Lake, AB
Bid Date: Sep 23 2025
Slave Lake, AB
Bid Date: Oct 31 2025
Slave Lake, AB
Bid Date: Nov 20 2025
Slave Lake, AB
--
Slave Lake, AB
Bid Date: Feb 27 2025
Slave Lake, AB
Bid Date: Mar 12 2025
Slave Lake, AB
--
Slave Lake, AB
--
Slave Lake, AB
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
