EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2025 at 7:00 PM

Updated October 1, 2024

Remodeling and renovation of a military facility in Silverdale, Washington. Completed plans call for the remodel of a military facility.

Install cable tags on each phase of Medium Voltage feeder F512, from switchgears, to pits, then in all manholes. Install in all areas that can access to the conductors. Maps and cable tag instruction and examples provided in Attachments #2-9. A list of each location and provided in Attachment #4. Escorts are required. This project is to Identify the 512 feeders in its entirety. Notify the government HV shop via outage requests to perform the following sub.5 feeder temporary connections during construction and to return the feeder connections back to normal once the existing sub.5 15 kV switchgear tagging are completed. Outage must be completed through NBK outage process. This process may require after hour and Work permits. Install cable tags on each phase of feeder F512 from B7205 switchgear, in B7205 pit, then in all manholes to B7035, B7207, B7410, B7418, B7421, B7422, and B7423Cable tags info and material shall meet UEM provided spec from P876 project. Submit cable segment tag names to UEM for govt. approval prior to cable tag ordering. Dewater manholes per Attachment #10 Naval Base Kitsap Phase II Stormwater Management Program PlanCable tags shall meet UEM provided spec from P876 project. Submit cable segment tag names to UEM for govt. approval prior to cable tag ordering. Attach new red plastic tags with white lettering of the F512 CTs, & PTs ratio and multitap settings on switchgear at each location. Include date and location of CTs/PTs inside SWGR on labels. Project will require separate outages to Delta North F512N manholes then Delta South F512S manholes to allow for de-energized work in support of shore power protection system electrical model data needed for power distribution to nuclear assets. This Project will require an NBK Energized Work Permit to Complete.

Post-Bid

Military

$250,000.00

Public - Federal

Remodeling, Renovation

12

3

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Cleaning Devices

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
70
Bidding Soon
984
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 5, 2025

img_map_placeholder

To Be Determined, Silverdale, WA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Feeder F512 Cable Tags & Switchgear Labels

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.