BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a mixed-use development in Eagle Grove, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The 2025 Mill and Overlay Project includes replacement of curb and gutter, resurfacing with hot mix asphalt, and select utility improvements. The construction proposed consists of, but is not limited to the following work items: Modified Subbase 400 TON Surface Aggregate 200 TON Shoulder Material 200 TON Pavement Milling 23210 SY Sidewalk Removal 452 SY Sidewalk, PCC, 6" 447 SY Detectable Warnings 440 SF PCC Removal 1247 SY PCC Patching, 6 IN 265 SY PCC Patching, 7.5 IN 900 SY PCC Driveway/Alley, 6 IN 83 SY Curb & Gutter Removal 186 LF Curb & Gutter, 2' 186 LF HMA Base Course, 2" 550 TON HMA Surface Course, 2" 550 TON HMA Base Course, 1.5" 1880 TON HMA Surface Course, 1.5" 1880 TON HMA Leveling Course 100 TON Intake Removal 23 EA Intake, SW-501 19 EA Intake, SW-503 3 EA Intake, SW-511 1 EA Manhole, Remove 11 EA Manhole, Sanitary, SW-301, 48" 3 EA Manhole, Storm, SW-401, 48" 7 EA Manhole, Storm, SW-401, 60" 1 EA Minor Adjustment, Manhole 15 EA Minor Adjustment, Intake 7 EA Minor Adjustment, Valve Box 2 EA Inlet Protection 43 EA Pavement Markings 26 STA Temporary Traffic Control 1 LS Railroad Coordination 1 LS Mobilization 1 LS Work shall commence upon the issuance of a written notice to proceed, no earlier than April 1, 2025. Work shall be substantially complete by no later than August 8, 2025. All work shall be completed and ready for final acceptance by September 15, 2025. All streets must be open and accessible for public use prior to ground freezing Substantial completion is defined as follows: All work is complete except for finish grading of turf restoration areas, seeding and minor clean up. Est. Value: $ 1,291,785.00 Site Directions: Throughout the City of Eagle Grove Each bid must be accompanied in a separate envelope by a bidding check or bid bond in an amount equal to five percent (5%) of the bid price, said check being either a certified or cashier's check, drawing on a credit union in Iowa or chartered under the laws of the United States, made payable to the City of Eagle Grove, Iowa, as security that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday and holidays, after award of the contract to him. This Work shall be subject to minimum wages and labor standards in accordance with Iowa State law. The City of Eagle Grove, Iowa reserves the right to reject any or all bids and to waive any irregularities or informalities in bids or bidding.

Award

Roads / Highways

$1,205,034.00

Public - City

Paving, Site Work

27

9

4

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
96
Bidding Soon
1,077
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 1, 2025

Project location map

Multiple Locations, Eagle Grove, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.