Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Site work and paving for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
Selective Grading, Cold Milling, Asphalt Concrete Pavement (ACP) and Other Work 53:12 6 Km E of Hwy 855 to Hwy 36 kilometre 15.321 to 35.160 Removal and Disposal of Existing Bridge Structure, Cold Milling, Asphalt Concrete Pavement (ACP) and Other Work 56:16 Hwy 53 to 2 Km S of Hwy 609 kilometre 0.010 to 21.767 Selective Grading, Granular Base Course (GBC), Cold Milling, Asphalt Concrete Pavement (ACP) and Other Work 609:02 Hwy 21 to West of the Village of Edberg kilometre 0.010 to 11.920 Subgrade Preparation, Granular Base Course (GBC), Asphalt Concrete Pavement (ACP) and Other Work 210:02 Hwy 56 to 1 km East of Hwy 56 kilometre 0.000 to 1.365 CENTRAL REGION APPROXIMATE QUANTITIES: 160,430 Tonne Supply of Aggregate - With Option 1 Lump Sum Trautman Pit Access 1 Lump Sum Traffic Accommodation 12 Unit Construction of Guardrail Sideslope Flares 11 Access Access Removal 134 Metre Culverts - Supply and Install (600 mm dia. C.S.P.) 1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 77415-1) 55 Cubic Metre Grouting of Abandoned Culverts 5,550 Square Metre Geogrid - Supply and Install 1,770 Cubic Metre Subgrade Excavation 8,600 Tonne Granular Base Course Des. 2 Class 25 1 Lump Sum Intersection Improvement - IN 19816 1 Lump Sum Intersection Improvement - IN 10358 10,610 Tonne Granular Fill Des. 6 Class 80 36,500 Square Metre Cold Milling Asphalt Pavement - Reprofiling 87,000 Square Metre Cold Milling Asphalt Pavement - 40 mm Depth 74,400 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth 3,475 Metre Crack Repair - Shallow Mill and Fill 10,200 Tonne Asphalt Concrete Pavement EPS Mix Type S1 (PG 52-34) 127,050 Tonne Asphalt Concrete Pavement EPS Mix Type M1 (PG 52-34) 3,600 Tonne Asphalt Concrete Pavement EPS Mix Type L1 (PG 52-34) 109.40 Kilometre Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 34.10 Kilometre Milled Rumble Strip - Centreline 39.10 Kilometre Milled Edge Line Rumble Strips with Gap Pattern 1,900 Metre Strong Post W-Beam Guardrail - Supply and Install 1,440 Metre High Tension Cable Barrier (TL-3, design dynamic deflection 2.4 m) - Supply and Install 1 Lump Sum Temporary Lighting Contractor to supply all materials.
Award
Bridges / Tunnels
$15,861,858.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2025
May 1, 2025
Multiple Locations, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Mar 03 2025
Edmonton, AB
Bid Date: Feb 28 2025
Edmonton, AB
--
Edmonton, AB
Bid Date: Oct 23 2020
Edmonton, AB
Bid Date: Feb 19 2025
Edmonton, AB
Bid Date: Feb 18 2025
Edmonton, AB
Bid Date: Feb 21 2025
Edmonton, AB
Bid Date: Mar 10 2025
Edmonton, AB
Bid Date: Mar 06 2025
Edmonton, AB
Bid Date: Feb 27 2025
Edmonton, AB
Bid Date: Feb 11 2025
Edmonton, AB
Bid Date: Mar 14 2025
Edmonton, AB
Bid Date: Feb 18 2025
Edmonton, AB
Bid Date: Nov 02 2020
Edmonton, AB
Bid Date: Nov 25 2020
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
