Published April 19, 2025 at 8:00 PM

Updated April 20, 2025

Site work and paving for a civil project in Eastsound, Washington. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

Bayhead Creek Culvert Replacement at Killebrew Lake Road Project Summary This contract provides for furnishing and installing a new precast concrete box culvert to address culvert draining deficiencies along Bayhead Creek beneath Killebrew Lake Road on Orcas Island, San Juan County, WA. Work includes stream diversion; clearing and grubbing with tree and stump removal; roadway excavation and disposal; installation of a precast box culvert; placement and compaction of gravel roadway base; installation of guardrails; asphalt paving; channel reconstruction and habitat restoration; and other work, all in accordance with the Contract Plans, Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge, and Municipal Construction, 2025 edition. Estimated Cost: $ 1.0 -1.6 million Time for Completion: 45 working days (Bid Option 1); 50 working days (Bid Option 2) For this project the County is requiring that bidders submit complete bids for both of the following separate bid options, and reserves the right to award a contract for construction of this project on the basis of the lowest responsive bid from a responsible bidder for either option, or not to award a contract if all bids exceed budget limitations or in the event of unavailability of FEMA funding. Bid Option 1 (Road Closure Option) includes a temporary, full road closure for a maximum duration of 9 consecutive calendar days. (Special Provision 1-08.5). Bid Option 2 (Detour Road Option) includes temporary detour road construction to bypass the project work area and maintain traffic through the site, with a partial road closure. (Special Provision 2-10). Bidders may attend in person or via remote conference. San Juan County reserves the right to accept or reject any or all bids in the best interest of the County and to waive irregularities in the bid or in the bidding process . Bids will be subject to review and compliance with specifications. Bid results will be posted on the County website page cited above. Amendments (Addenda): Any Addenda to the Contract Provisions and Plans will be posted online. Only Bidders who have notified San Juan County Public Works that they are interested in supplying a quote will be notified of Addenda. Notification will be made using the contact information provided by the bidder. Bidder Questions: In accordance with Standard Specification 1-02.4(1): Oral explanations, interpretations, or instructions given by anyone before the Award of a Contract will not be binding on San Juan County. Any information given a prospective Bidder concerning any of the Bid Documents will be furnished to all prospective Bidders as an Addendum if that information is deemed by San Juan County to be necessary in submitting Bids or if San Juan County concludes that the lack of the information would be prejudicial to other prospective Bidders. The project site is open to bidders for inspection. Bid Guarantee: Bid deposit shall be submitted with each bid by check or money order, in the amount of 5% of the bid amount, or a bid bond in lieu of deposit. Bidder Requirements: The successful bidder must meet all the mandatory bidder responsibility criteria set forth in RCW 39.04.350 and will be required to carry and maintain a minimum of $1 million in liability insurance coverage throughout the period of the contract, in accordance with County policy. Contract Bonds: The successful bidder shall provide executed payment and performance bonds for the full contract amount, in accordance with RCW 39.08.010. Permits: All permits have been obtained for this project and any relevant provisions for the bidder have been included in the contract provisions and plans Prevailing Wages: Washington State wage laws and rules apply. In preparing a bid, contractors must use the prevailing wage rates in effect for San Juan County on the date bids are due, which may be viewed in person at Public Works or obtained on the L&I website at online Withholding of Retainage: Pursuant to RCW 60.28.011, a sum of 5% of the monies earned by the Contractor will be retained from progress payments, to be held in an account by the County unless otherwise requested by the Contractor. Notice of U.S. DOT Title VI Assurances : San Juan County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$1,706,887.00

Public - County

Paving, Site Work

25

4

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
2
Bidding Soon
1,721
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 28, 2025

Project location map

Killebrew Lake Rd, Eastsound, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.