BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 20, 2025

Renovation of a water / sewer project in Eastsound, Washington. Completed plans call for the renovation of a water / sewer project.

ESWD WWTP Upgrade Phase II Project Hard copies must be received no later than March 10, 2025 at 5:00 pm. Please contact Jeff Christner or Matt Strittmatter, Wilson Engineering, (360) 733-6100, for project information. A deposit in the form of a postal money order, cashiers check, or bond in the amount of 5% of the greatest amount bid must be submitted with each bid proposal. Should the successful bidder fail to enter into a contract or furnish a satisfactory contract bond within the time stated in the specifications, the deposit shall be forfeited to the District. The District shall reject any bid not accompanied by bid security. The District reserves the right to reject any or all bids if such action is in the best interest of the District. The East sound Sewer and Water District is an equal opportunity and affirmative action employer. Small, Minority and Women-owned businesses are encouraged to submit bids. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to this contract or any subcontract resulting from this solicitation for bids. All bidders must be licensed contractors registered in the State of Washington. The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. All work performed on this project will be subject to the higher of the prevailing state or federal wage rates. Contractor shall furnish all labor, tools, equipment and materials not pre-purchased or supplied by the Owner. In addition, the Contractor shall provide demolition, shoring, bracing, sheeting, cribbing, falsework, pumping, dewatering, drainage, forms, and all material as required or necessary to demolish, excavate, backfill, grade, construct, lay, erect, install, test, and clean-up site. The work shall consist of, in general, the expansion of the existing wastewater treatment plant. Estimated Budget: $9M to $11M

Post-Bid

Water / Sewer

$11,000,000.00

Public - City

Renovation

95

40

35

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
111
Bidding Soon
2,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 30, 2025

Project location map

143 Cessna Rd, Eastsound, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.