Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Site work for an educational facility in Larkspur, California. Completed plans call for site work for a educational facility.
As of March 27, 2025, construction is anticipated to commence April 2025 and be complete end of 2025. This Project consists of: The Redwood High School Ghilotti Field Site Improvements consists of replacement and addition of concrete curbs and flatwork, safety netting, 5- row non-elevated bleachers and stormwater mitigation. Included in the scope of work will also be improvements to the accessible / egress routes and improvements to the existing field. To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors' license(s): A General Engineering or B General Building Any bid that is submitted after this time shall be nonresponsive and returned to the bidder. Required documents include a bid bond by an admitted surety insurer on the form provided by the District, a cashier's check or a certified check, drawn to the order of the Tamalpais Union High School District, in the amount of ten percent (10%) of the total bid price shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The successful Bidder will be required to certify that it either meets the Disabled Veteran Business Enterprise ("DVBE") goal of three percent (3%) participation or made a good faith effort to solicit DVBE participation in this Contract if it is awarded the Contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.
Post-Bid
Educational
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
April 1, 2025
395 Doherty Dr, Larkspur, CA
Related To This Project
Larkspur, CA
Bid Date: Feb 25 2025
Larkspur, CA
--
Larkspur, CA
Bid Date: Mar 12 2025
Larkspur, CA
Bid Date: Apr 17 2025
Larkspur, CA
Bid Date: Aug 07 2025
Larkspur, CA
Bid Date: Aug 28 2025
Larkspur, CA
Bid Date: Jul 28 2020
Larkspur, CA
Bid Date: Dec 03 2024
Larkspur, CA
Bid Date: Oct 22 2024
Larkspur, CA
Bid Date: Oct 22 2024
Larkspur, CA
Bid Date: Oct 17 2024
Larkspur, CA
Bid Date: Aug 29 2024
Larkspur, CA
Bid Date: Feb 20 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
