BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway.

Installation of Concrete Traffic Islands, Pavement Markings, Sign Installation, Variable Thickness Asphaltic Concrete Pavement, Variable Thickness Concrete Base, 6" Concrete Base, Concrete Curb & Gutter, 5" Concrete Walk, Concrete Removals, Construction Staking, Manhole Adjustments, Sodding, Gravel Filling, Cuc; Located at: Td07784001 - North 60th Street: West Green Tree Road to West Hemlock Street, Local Streets W/o North 60th Street St216240106 - North 60th Street: West Mill Road to West Green Tree Road St216230106 - North 60th Street: West Hemlock Street to West Bradley Road . Official Notice No. 21-1-25 Liquidated Damages, Per Diem: $1000.00/day Time for Completion: All Work on This Contract Shall Be Completed by August 1, 2025. The Apprenticeship Requirements for This Project Are: 0. If This Contract is Awarded at $500,000 or Higher, 25% of All Apprentice Labor Hours Must Be Worked by Apprentices Certified for Participation in the Residents Preference Program and 40% of All Apprentice Labor Hours Must Be Attributed to Apprentices Living in the Following Zip Codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233 the Contractor Shall Specifically Note the Sbe, Residency, and Apprenticeship Forms for This Project. If the Forms Are Not Filled Out Properly, It Will Be Cause for Rejection of the Bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to Accompany Bid: 10% of the Contractor's Base Bid. For Those Bids Being Submitted Through Online and Using a Manual Bond, the Contractor May Send a Signed/executed Copy of the Bid Bond to the Department of Public Works Contract Office by Emailing Dpwbids@milwaukee.gov. Any Required Addenda or Response Related to Listed Projects Will Be Posted on Both the Dpw and online Websites. Call 414-286-3314 to Have Your Company's Name And Contact Information Added to The Plan Holder's List. Pay M E N T M O N I T O R I N G Requirements: All Contractors Awarded a Contract Valued at $25,000.00 or More Are Required to Participate in Training on the City Of Milwaukee's B2gnow Contract Compliance Software Within 30 Days of the Contract Award Date. Throughout the Contract Term, Contractors Are Required to Regularly Provide Timely Subcontractor Payment Information in the City's Contract Compliance Software. Please Contact the Office of Equity and Inclusion (Oei) at 414-286-5553 Should You Have Any Questions or Concerns Regarding the Training or Reporting Process. Pay R O L L M O N I T O R I N G Requirements: the Prime Contractor Awarded This Project is Required to Participate in Training On the City of Milwaukee's Labor Compliance Reporting (Lcr) Software After the Date of Contract Award. Throughout the Contract Term, Contractors Are Required To Regularly Provide Timely Payroll Information via the Lcr App. Please Contact the Dpw Contracts Office at 414-286-3314 Should You Have Any Questions or Concerns Regarding the Training or Reporting Process. Contractor Must Comply With All Provisions of the City of Milwaukee General Official. The Original Bid Bond Document Must Then Be Submitted by the Contractor to the Department of Public Works Contract Office in-person or by Mail to 841 N Broadway, Rm. 506, Milwaukee, Wi 53202, Within 24 Hours Upon Being Notified That They Are the Apparent Low Bidder.

Bid Results

Roads / Highways

$1,281,133.00

Public - City

Paving, Site Work

39

3

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
42
Bidding Soon
1,928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

Project location map

Multiple Locations, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.