EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Bellwood, Illinois. Completed plans call for site work for a road / highway.

As of February 21, 2025, this project has not yet been awarded. The project is expected to be awarded on March 19, 2025. Traffic Signal Improvements Project - 5 Intersections sealed bids will be received for the following Improvement: Traffic Signal Improvements Project - 5 Intersections: Washington Boulevard & Bellwood Avenue Washington Boulevard & Eastern Avenue Washington Boulevard & 25th Avenue 25th Avenue & Oak Street 25th Avenue & St. Charles Road All proposals or bids offered must be accompanied by a bid bond, a certified check, or a cashier's check, made payable to the President and the Board of Trustees of the Village of Bellwood in the amount of not less than ten percent (10%) of the total amount of the proposal, as a guarantee that if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the proposals without the consent of the President and the Board of Trustees of the Village of Bellwood for a period of 30 days after the scheduled time of closing bids. The successful bidder will be required to file a performance bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the President and Board of Trustees, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of work specified in accordance with the plans and specification therefore, according to the time and terms and conditions of the contract; and also that the bidder and contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished. The Contractor will be required to furnish sufficient insurance or guaranty of indemnity to the Village of Bellwood, Illinois, the County of Cook, Illinois, and the Engineer against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the President and Board of Trustees of the Village of Bellwood, Illinois. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), the Employment of Illinois Workers on Public Works Act, and other applicable State and Federal Laws and regulations pertaining to labor standards. The Village of Bellwood reserves the rights to determine the lowest, responsive, responsible bidder, to waive irregularities, and to reject any or all bid proposals.

Bid Results

Roads / Highways

$950,489.00

Public - City

Site Work

49

8

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
136
Bidding Soon
2,268
All Active Projects
1,016
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 15, 2025

img_map_placeholder

Multiple Locations, Bellwood, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Traffic Signal Improvements Project - 5 Intersections

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.