Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 3, 2025 at 8:00 PM
Updated September 23, 2026
Renovation of a military facility in Frankfort, Kentucky. Completed plans call for the renovation of a 12,467-square-foot, one-story above grade military facility.
Work of the Project includes selective renovation of the existing 12,467 +/- GSF, one story Boone National Guard USPFO building including reconfiguration of interior spaces with new metal stud and gypsum wallboard assemblies and built-in cubicles; removal of existing cubicles and furniture; removal of and replacement of existing lock cores and select hardware; replacement of select doors and hardware; installation of new doors and hardware; interior renovation of all restrooms including replacement of all plumbing fixtures, demo of existing ceramic floor tile and wall tile, installation of new epoxy resinous flooring, new cast terrazzo shower bases, new wall tile, new lockers, new toilet partitions and toilet accessories. Additional interior finishes include carpet tile; LVT flooring; painting of walls, and replacement of ceilings The work also includes renovation/replacement of select portions of existing plumbing, HVAC and electrical systems including complete lighting replacement. Three existing packaged rooftop units are to be replaced along with one existing split system with duct furnace. Areas of existing ductwork are to largely remain with some units receiving all new sheet metal ductwork. All ducting systems shall recieve new grilles, registers and diffusers for the new ceiling system. Controls work associated with mechanical will include integration of new units to ALC's webcontrol platform. Electrical work is focused on light fixture replacements for the new ceiling, power and data for new framed partitions along with various repairs and devices to support fixtures and mechanical equipment. Lighting controls are to be consistent with current energy code in Kentucky (IECC 2012) which are to include occupancy and vacancy sensors for various regularly occupied spaces such as offices and conference rooms. Other common spaces such as corridors will have local controls for on/off. No centralized lighting controls system to be installed.
Award
Military
$1,446,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
March 1, 2025
100 Minuteman Pkwy, Frankfort, KY
Related To This Project
Frankfort, KY
Bid Date: Feb 05 2025
Frankfort, KY
Bid Date: Feb 05 2025
Frankfort, KY
Bid Date: Feb 05 2025
Frankfort, KY
Bid Date: Feb 14 2025
Frankfort, KY
Bid Date: Feb 13 2025
Frankfort, KY
Bid Date: Feb 19 2025
Frankfort, KY
Bid Date: Feb 19 2025
Frankfort, KY
Bid Date: Feb 18 2025
Frankfort, KY
Bid Date: Feb 20 2025
Frankfort, KY
Bid Date: Mar 19 2025
Frankfort, KY
Bid Date: Feb 12 2025
Frankfort, KY
Bid Date: Feb 13 2025
Frankfort, KY
Bid Date: Feb 11 2025
Frankfort, KY
Bid Date: Feb 27 2025
Frankfort, KY
Bid Date: Feb 28 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed