BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Renovation of a mixed-use development in Peachtree City, Georgia. Completed plans call for the renovation of a swimming pool.

The City of Peachtree City will be receiving separate sealed Bids for all material, labor and equipment for the "Kedron Pool Boiler Replacement". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications. Project includes furnishing equipment and labor to replace the boiler used to heat the water for both pools at the Kedron Aquatic Center, replace the pumps and related piping to circulate heating fluid through heat exchangers, and test and balance entire system once installed. This contract is locally funded. The project shall be Substantially Complete within 120 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $250.00 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $250.00 per day for each calendar day required to achieve Final Completion. The City of Peachtree City provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained by N/A. The City of Peachtree City will not accept pre-bid project questions within a period of 120 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. The City of Peachtree City will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays Agreement will require a Payment Bond in the amount of 110%, and a Performance Bond in the amount of 100% of the project cost. The City of Peachtree City reserves the right to bid a project in phases and award the contract on the phases it deems to be in the City's best interest Question Deadline 02/20/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted in writing via Email Communication to the Purchasing Manager at aegan@peachtreecity.org. Interpretations or clarifications considered necessary by Peachtree City in response to such questions will be issued by Addenda posted to the website. Questions received less than five business days prior to the date for opening of Bids may not be answered.

Award

Swimming Pools

$275,000.00

Public - City

Renovation

8

11

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
133
Bidding Soon
2,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 31, 2025

Project location map

202 Fieldhouse Dr, Peachtree City, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.