BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Renovation of a residential development in Billings, Montana. Completed plans call for the renovation of a residential development.

Each bid must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Billings, Montana, in an amount not less than ten percent (10%) of the total amount of the bid. The bid security will be retained by the City Clerk until the successful bidder enters into a contract with the City of Billings. If no contract is entered into, by the successful bidder, within sixty (60) days, the security may be forfeited to the City of Billings. Successful bidders will be required to furnish an approved Performance Bond in the amount of one hundred percent (100%) of the contract amount. Bidders may withdraw their bid either personally or by written request at any time prior to the time set for bid opening. No bid may be withdrawn or modified after the time set for opening, unless and until the award of the contract is delayed for a period exceeding ninety (90) days. The right is reserved to reject any or all bids received, to waive irregularities, to postpone the award of the contract for a period of not to exceed ninety (90) days, and to accept that bid which is in the best interests of the City of Billings, Montana. The City of Billings is an Equal Opportunity Employer. The Contractor and subcontractor shall abide by the requirements of 41 CFR 60-300.5(a) and 41 CFR 60-741.5(a), which prohibit discrimination against qualified protected veterans and/or qualified individuals on the basis of disability, and requires affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities. Question Deadline 02/26/2025 Should a bidder find discrepancies in, or omissions from, the specifications, or be in doubt as to their meaning, bidder shall notify Tam Rodier, CD Program Coordinator at Community Development Division, 316 North 26 th Street, 4 th Floor, Billings, MT 59101, Questionsreceived lessthan ninety-six (96) hours before the bid opening cannot be answered.

Bid Results

Residential Subdivision

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
9
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

Project location map

1302 Parkhill Dr, Billings, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.