Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 14, 2025 at 8:00 PM
Updated March 15, 2025
Site work for a water / sewer project in Everett, Washington. Completed plans call for site work for a water / sewer project.
The Project consists of repairs and improvements to the underground utilidor tunnel network connecting various buildings at Everett Community College's North Everett campus. The utilidor network contains active and decommissioned steam piping, electrical power distribution, communications cabling, and other utilities. At several locations, underground water and sewer lines pass perpendicularly through the utilidor. The utilidor network suffers from water intrusion caused by the internal steam distribution system, severe condensation on the cast-in-place concrete lids and associated steel decking, chronic leaks at the joint between the utilidor walls and lids, cracks and utility (active and abandoned) penetrations at tunnel walls, and other sources. The primary purpose of this Project is the reduce the quantity of water entering the utilidor network, to replace materials damaged by prior water intrusion, and to protect basement utility spaces served by the utilidor system from flooding. 1. If Alternate Bid Item No. 1 is accepted by the Owner, Project scope will be amended to include the removal of select portions of stay-in-place corrugated steel decking at utilidor lid. BID - EVC - Utilidor Repair - Everett Community College
Award
Water / Sewer
$347,400.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
March 24, 2025
2000 Tower St, Everett, WA
Related To This Project
Everett, WA
Bid Date: Feb 27 2025
Everett, WA
Bid Date: Mar 06 2025
Everett, WA
Bid Date: Mar 06 2025
Everett, WA
Bid Date: Feb 27 2025
Everett, WA
--
Everett, WA
Bid Date: Feb 20 2025
Everett, WA
Bid Date: Feb 12 2025
Everett, WA
Bid Date: Feb 18 2025
Everett, WA
Bid Date: Feb 11 2025
Everett, WA
Bid Date: Feb 25 2025
Everett, WA
Bid Date: Jan 28 2025
Everett, WA
Bid Date: Feb 13 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
