Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work, paving and outdoor lighting for a mixed-use development in Ocala, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

Scope of the project consists of constructing a new traffic signal at the intersection of State Road 40 and NW/SW 46th Avenue. Signalization improvements will include constructing concrete strain poles, traffic signals, ITS and smart signal technology, pedestrian signals and detectors, pavement markings and signage, and street lighting. Inlet protection system are also included. Construction activities include mobilization, maintenance of traffic, clearing and grubbing, earthwork, potable water utilities, paving, and pedestrian and bicycle facilities. All pedestrian and bicycle facilities must adhere to current ADA standards. The resulting Contract will be for ONE HUNDRED EIGHTY (180) calendar days. All work shall be substantially completed by Contractor in a manner satisfactory to the City Project Manager within ONE HUNDRED FIFTY (150) days of the start date indicated on the Notice to Proceed and ready for final payment within THIRTY (30) days of substantial completion. Bidder must be FDOT Pre-Qualified with reviewed financial statements in the following work classes in accordance with Florida State Statute 337.14 and Florida Administrative code 14-22. o Grading o Flexible Paving o Traffic Signal For individual projects, the Contractor shall pay the City using the schedule below for each calendar day that expires after the time specified for Substantial Completion until the Work is substantially completed. After Substantial Completion, if the Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times or any proper extension thereof granted by the City, the Contractor shall pay an additional $200.00 per day for each calendar day that expires after the time specified. Question Deadline 03/03/2025 at 5:00 PM ET Bid security equal to five percent (5%) of the total bid amount must accompany each bid. The successful Bidder will be required to furnish a certified, recording Public Construction Bond (as security for the faithful performance of the payment of all bills and obligations arising from the performance of the Contract) in an amount not less than the total Contract amount. The successful Bidder will also be required to furnish a Maintenance and Guarantee Bond for 10% of the total project value, prior to final payment, for a period of three (3) years for labor and three (3) years for materials from the date of final completion.

Award

Roads / Highways

$1,930,930.00

Public - City

Outdoor Lighting, Paving, Site Work

20

3

11

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
141
Bidding Soon
2,098
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.