Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2025 at 7:00 PM
Updated March 12, 2025
Site work, paving and new construction of a mixed-use development in Ocala, Florida. Completed plans call for the construction of a 356,275-square-foot educational facility; for site work for a educational facility; playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; and road / highway.
Marion County Public Schools CCC High School Wharton-Smith, Inc. is the Construction Manager proudly serving Marion County Public Schools and is soliciting proposals from prequalified subcontractors for the construction of the CCC High School. This is a greenfield project for a new 356,275 SF high school consisting of Bldg. 1 Classroom/Admin, Bldg. 2 Gym Cafeteria/Kitchen, Bldg. 3 Theater/Music/Arts, Bldg. 4 CEP and 6 additional ancillary sports field bldgs. The work includes: earthwork, paving, track and play courts, irrigation, landscaping, fencing, concrete, masonry, structural steel joists & deck (in the ancillary sports field buildings only), misc. structural steel item such as railings & metal stairs, roofing, sealants, fireproofing, doors, frames & hardware, overhead doors, windows, storefront, gypsum wallboard assemblies, acoustical ceilings, wood flooring, resilient and tile flooring, hard tile, carpeting, acoustic panels, painting, signage, visual display & marker boards, operable partitions, toilet compartments & accessories, lockers, aluminum walkway covers, flagpoles, media center specialties, food service specialties, athletic equipment, theater & stage equipment, modular & laboratory casework, media center & music casework, fixed auditorium seating, telescoping stands, grandstands, and elevators. The plumbing, HVAC and electrical are for buildings 5 through 11 and site & sports lighting only. The concrete scope for this package is to include Building 5-11, Courtyard and entire site hardscape. The roofing scope for this package is to include ALL roofing for ALL buildings. This bid package #5 is for the interiors of all buildings on campus and athletic ball fields and Please note the following Bid Packages have been bid and released and shall be excluded from this scope: Bid Package #2: Building Foundations/underground utilities Bid Package #3: HVAC and Electrical Long Lead Equipment (chillers, cooling tower, pumps, switchgear & generator/fuel tank) Bid Package #4: Building 1 through #4 Shell: including concrete shell, structural steel, exterior doors, and windows. Bid Package #5A Building 1 through #4 Mechanical, Electrical, Plumbing and Fire Sprinkler Construction for this phase is tentatively scheduled to start in April 2025 and finishing in July 2026. A virtual Pre-Bid Meeting will be scheduled soon and a MS Teams Meeting link will be provided. Bids received after the appointed date and time are subject to rejection. RFI's are due by 2:00 PM on Thursday, February 27, and may be emailed to comest@whartonsmith.com. Please do not contact the Architect or Owner for information on this project.
Post-Bid
Roads / Highways
$2,000,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 11, 2025
To Be Determined, Ocala, FL
Related To This Project
Ocala, FL
Bid Date: Feb 27 2025
Ocala, FL
Bid Date: Feb 28 2025
Ocala, FL
Bid Date: Mar 03 2025
Ocala, FL
Bid Date: Mar 04 2025
Ocala, FL
Bid Date: Mar 25 2025
Ocala, FL
Bid Date: Mar 07 2025
Ocala, FL
Bid Date: Mar 19 2025
Ocala, FL
Bid Date: Feb 27 2025
Ocala, FL
Bid Date: Feb 06 2025
Ocala, FL
--
Ocala, FL
--
Ocala, FL
Bid Date: Oct 21 2021
Ocala, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
