Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 1, 2025 at 7:00 PM
Updated December 2, 2025
Renovation of a medical facility in Mission, British Columbia. Completed plans call for the renovation of a medical facility.
Mission Memorial Hospital Mission Memorial Hospital Laboratory is replacing 1 DxC600i chemistry analyzer and 1 benchtop Access 2 analyzer as they are reaching end of life and replacing with 2 new analyzers: the Beckman Coulter DxC500i chemistry analyzer. Accompanied by 2 new UPS’s, and a 2 new water filtration system’s will be installed. At the time of the feasibility report, there was limited information from Beckman Coulter on the equipment for placement and installation of the analyzer and the required services. The water filtration system requirements have been based on an Evoqua filter system used for DxC700AU as directed by Devena Steinmann (Project Sponsor). Fraser Canyon Hospital Fraser Canyon Hospital Laboratory is replacing 1 DxC600i chemistry analyzer and 1 benchtop Access 2 analyzer as they are reaching end of life and replacing them with 2 new analyzers – the Beckman Coulter DxC500i chemistry analyzer. Accompanied by 2 new UPS’s and a new water filtration system will be installed. At the time of the feasibility reports, there was limited information from Beckman Coulter on the equipment for placement and installation of the analyzer and the required services. The water filtration system requirements have been based on an Evoqua filter system used for the DxC700AU as directed by Devena Steinmann (Project Sponsor) These projects will have at least 3 phases each. Note that a fully operational analyzer must be working at all times. The project's construction budget is estimated at $ 1,937,456 (MMH; $822,471 + FCH; $1,114,985) including Construction Management fees, overhead and profit. The budget goal is to keep the construction cost inclusive of change orders and escalation under the $ 1,937,456 as mandated by the Ministry of Health and FHA leadership. Documents can be obtained from https://fraserhealth.bonfirehub.ca/opportunities Award amount was not released for publication.
Award
Medical
$1,937,456.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
July 2, 2025
Multiple Locations, Mission, BC
Related To This Project
Mission, BC
Bid Date: Mar 11 2025
Mission, BC
Bid Date: Feb 12 2025
Mission, BC
Bid Date: Apr 17 2025
RFP Contractor - Supply and Installation of Access Control System - Public Safety Building - 5756470
Mission, BC
Bid Date: Jun 18 2025
Mission, BC
Bid Date: May 28 2025
Mission, BC
Bid Date: Jun 05 2025
Mission, BC
Bid Date: Jun 16 2025
Mission, BC
Bid Date: Jun 18 2025
Mission, BC
Bid Date: Apr 24 2025
Mission, BC
Bid Date: Feb 18 2025
Mission, BC
Bid Date: Feb 12 2025
Mission, BC
Bid Date: Oct 16 2025
Mission, BC
Bid Date: Jan 09 2025
Mission, BC
Bid Date: Feb 03 2025
Mission, BC
Bid Date: Jan 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
