EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Saint Louis, Missouri. Completed plans call for the renovation of a municipal facility.

Sealed Bids for the DOORWAYS, in the City of St. Louis, Energy Efficiency and Accessibility Renovation of the Cooper House Assistive Living Facility for People Living with HIV Unable to Live Independently Project (DOORWAYS' Cooper House Improvements) Project work includes, but is not limited to, the following: 1. Replacement of the existing Cooper House EPDM and asphalt shingle roof. 2. New gutters and downspouts at Cooper House. 3. Replacement of the existing Cooper House windows. 4. Tuckpointing of Cooper House masonry façade and parapet copings. 5. East Wing corridor sub-flooring repairs at the 1st and 2nd floors of Cooper House. 6. Replacement of the existing Cooper House elevator. 7. Waterproofing of the Cooper House South and West foundations. 8. New drain tile and sump pump at the existing ground floor storage room of Cooper House. 9. Replacement of Cooper House siding at the North Elevation. 10. Kitchen and Dining expansion at Cooper House. 11. New finishes, plumbing fixtures, and electrical fixtures to the 1st floor offices, resident units, and common areas at Cooper House. 12. Install new VRF mechanical system to the entirety of Cooper House (equipment furnished). 13. New electrical to support the new VRF mechanical system at Cooper House. Location 4385 Maryland Avenue, St. Louis, MO 63108 This project is funded in part through HUD Community Project Funding (CPF) Grant funds. Additional funding from both State and Local public ARPA funds through the MO Dept. of Mental Health and the City of St. Louis Affordable Housing Commission and private sources, including Missouri Historic Tax Credits. This project is contingent upon DOORWAYS receiving an executed grant agreement from HUD. Question Deadline 02/26/2025 at 5:00 PM CT Note that questions must be submitted via email only

GC Bidding

Municipal

$400,000.00

Public - City

Renovation

78

32

16

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Glass Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roofing and Siding Panels, Siding, Membrane Roofing, Elastomeric Membrane Roofing, Ethylene-Propylene-Diene-Monomer Roofing, Roll Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Resilient Athletic Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Residential Equipment, Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
59
Bidding Soon
667
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 7, 2025

img_map_placeholder

4385 Maryland Ave, Saint Louis, MO

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Doorways Cooper House Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.