BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated September 3, 2025

Site work and renovation of an educational facility in Goodyear, Arizona. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Pursuant to provisions of the School District Procurement Rules, Agua Fria High School District No. 216 intends to establish a Construction Manager at Risk (CM@R) (pre-construction and construction) Services for the Millennium High School Campus Master Plan Phase 2. Background Project Description DLR Group 6225 N. 24th St Phoenix, AZ 85016 Location: 14802 W. Wigwam Blvd, Goodyear, AZ 85395 Phase 2 is anticipated to be the main component of the Campus Master Plan adopted by the District in the Fall of 2024. The main component consists of a proposed new 42,000 square foot two story building integrated into approx. 20,000 square feet of existing campus buildings basements. The New building may include innovative learning spaces, labs, heavy and light CTE (Career and Tech. Ed.) spaces and a large multifunction space. Renovation of basement areas and adjacent existing spaces is anticipated. Major utility and infrastructure modeling, tracing, phasing and relocation is anticipated. In addition to collateral site work associated with the new building, large scale site work in and around the new and remodeled building including terraces, landscape, hardscape, and canopies with be necessary. Other misc. campus renovations will be including as budget allows. The CM is expected to participate in an integrated preconstruction process of predesign to determine scope, cost, and implementation of the project for best value and least disruption for the district. Anticipated Construction Schedule: Summer minor components and/or prework for main project: Construction Start 5/2025 - Substantial Completion 8/2025 Main Project: Construction Start 3/2026 - Substantial Completion 12/2027 Estimated Budget: $34 million construction cost Question Submission Deadline:January 30, 2025, 4:30pm

Award

Educational

$34,000,000.00

Public - City

Renovation, Site Work

65

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
48
Bidding Soon
1,032
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 1, 2026

Project location map

14802 W Wigwam Blvd, Goodyear, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.