BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work and new construction of a mixed-use development in Whiteville, Tennessee. Completed plans call for the construction of a 5,000-square-foot, one-story above grade educational facility.

Plans call for the construction of two new ground up, 1-story buildings connected by a breezeway for a total of 5,000 square feet. Addendum #1 has been issued as of 2-26-2026. Questions shall be received by designer at least six calendar days before bid opening date 1.01 Scope of Work: This project consists of the construction of two (2) new one story buildings on the existing TCAT Whiteville campus. The (2) approx. 2000 sf buildings are connected by a breezeway creating approx. 5000 sf total covered area. Construction type is a CMU walls with steel structure, and brick veneer and an architectural metal panel roof assembly. The work shall include all civil, architectural, structural, mechanical, plumbing, and electrical work, and the following: 1. Additionally, the General Contractor shall ensure to include the following as a part to the Work: 2. All utilities as required for building operation both from inside the building(s) to 5'-0" outside the building(s). and from 5'-0* outside the building(s) to the appropriate main service line as coordinated with utilities provider or other applicable city officials. This includes tap fees. meters. connections, electrical transformer and pad (as required), and all other Work related to utility provision and installation as required for complete operation. B. All items furnished for the Work shall be new. All work shall be accomplished in a manner acceptable to the Owner and Architect. C. Materials and Labor required to complete Work called for in the Contract Documents are to be furnished and performed in a faithful and thorough manner. D. It is understood that, except as otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, connections, permit fees, service lines to meters by Utilities, transportation, superintendent, temporary construction. services, facilities and all cost to execute and complete the entire Work being done under the Contract Documents and deliver it complete and ready for it's intended use E. The Contractor shall perform all Work as described in the accompanying Sections of this Project Manual and shown on the Drawings, both as enumerated generally in the Index to Specifications and Drawings Index. F. Provide to the Owner a completed building. The Contractor shall furnish and install all items, whether specifically shown or specified, that are necessary or required to furnish a complete, water-tight, weather-proof building.

Bid Results

Educational

$1,657,000.00

Public - State/Provincial

New Construction, Site Work

62

23

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

May 4, 2026

Project location map

1685 US-64, Whiteville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.