BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 22, 2025

Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.

The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Salt River Outfall (SRO) Parallel Interceptor project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The project is located in the vicinity of West Lower Buckeye Road and South 47th Avenue to West Broadway Road and South 59th Avenue. The estimated construction cost is $61 million. The CMAR will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format, or it will not be accepted. A. Preconstruction phase services by the CMAR may include the following: provide detailed cost estimating and knowledge of marketplace conditions provide project planning and scheduling provide for construction phasing and scheduling that will minimize interruption to City operations provide alternate systems evaluation and constructability studies advise City on ways to gain efficiencies in project delivery provide long-lead procurement studies and initiate procurement of long-lead items assist in the permitting processes participate with the City in a process to set a goal for local and SBE participation and implement the local and Small Business Enterprise (SBE) process protect the City's sensitivity to quality, safety, and environmental factors advise City on choosing green building materials. Questions. Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Julie B. Smith at (602) 534-2418 or julie.b.smith@phoenix.gov (preferred).

Post-Bid

Water / Sewer

$61,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
39
Bidding Soon
1,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

June 20, 2025

Project location map

W Lower Buckeye Rd, Phoenix, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.