Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2025 at 7:00 PM
Updated February 22, 2025
Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Salt River Outfall (SRO) Parallel Interceptor project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The project is located in the vicinity of West Lower Buckeye Road and South 47th Avenue to West Broadway Road and South 59th Avenue. The estimated construction cost is $61 million. The CMAR will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format, or it will not be accepted. A. Preconstruction phase services by the CMAR may include the following: provide detailed cost estimating and knowledge of marketplace conditions provide project planning and scheduling provide for construction phasing and scheduling that will minimize interruption to City operations provide alternate systems evaluation and constructability studies advise City on ways to gain efficiencies in project delivery provide long-lead procurement studies and initiate procurement of long-lead items assist in the permitting processes participate with the City in a process to set a goal for local and SBE participation and implement the local and Small Business Enterprise (SBE) process protect the City's sensitivity to quality, safety, and environmental factors advise City on choosing green building materials. Questions. Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Julie B. Smith at (602) 534-2418 or julie.b.smith@phoenix.gov (preferred).
Post-Bid
Water / Sewer
$61,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
June 20, 2025
W Lower Buckeye Rd, Phoenix, AZ
Related To This Project
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Feb 27 2025
Phoenix, AZ
Bid Date: Mar 14 2025
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Apr 02 2025
Phoenix, AZ
Bid Date: Apr 02 2025
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Feb 06 2025
Phoenix, AZ
Bid Date: Feb 25 2025
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Mar 07 2025
Phoenix, AZ
Bid Date: Feb 26 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
