EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Monterey, California. Completed plans call for site work for a fire / police facility.

Bids shall be valid for 90 Days after the bid opening date. Engineers Estimate $192,775 .00 All bidders must register on OpenGov Procurement. To receive registration instructions call the Purchasing Division at (831) 646-3887 or visit website for registration instructions. Bids must be submitted on the City's Bid Forms. It is the responsibility of each prospective bidder to download all bid documents for review before submitting a bid. Any Addenda will be posted on OpenGov Procurement. It is the responsibility of each prospective bidder to check OpenGov Procurement on a daily basis through the close of bids for any applicable addenda or updates. The City does not assume any liability or responsibility based on any defective or incomplete copying, scanning, downloading or printing of the bid documents. Information on OpenGov Procurement may change without notice to prospective bidders. The Contract Documents shall supersede any information posted or transmitted by OpenGov Procurement. Question Submission Deadline: February 26, 2025, 5:00pm Question Response Deadline: February 28, 2025, 5:00pm Should a Bidder be in doubt as to the true meaning of any item in the Plans or Specifications or discover items containing discrepancies or omissions, the Bidder is responsible for immediately notifying the Engineer. All questions must be submitted in writing through the OpenGov Procurement Question/Answer Tab via the Citys e-Procurement portal The work to be done consists of furnishing all labor, materials, methods and processes, implements, tools, equipment, incidentals and machinery except as otherwise specified, which are necessary and required to complete the contract in a satisfactory and workmanlike manner. The intent of the plans and specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the contract. Where the plans or specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the best quality are to be used. CHANGES AND EXTRA WORK Changes and extra work shall be in accordance with Section 4-1.05, Changes and Extra Work, of the Standard Specifications. The Engineer reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work or to omit any items or portion of the work, as may be deemed by the Engineer to be necessary or advisable, and to require such extra work as may be determined by the Engineer to be necessary for the proper completion or construction of the whole work contemplated. When special conditions arise, such as mitigation of unforeseen conditions or additional work, the work shall be negotiated as "extra work" in accordance with the Standard Specifications. Approved Change Orders shall describe the changes or extra work, contract time adjustments and payment basis for such work as applicable. Change Orders are valid contract amendments when approved and signed by the City and Contractor. All changes and extra work must be negotiated and approved before the work is performed. The City may require the Contractor to work outside approved construction hours noted in Part IV, Construction Procedure. For work done during these times, when required by the City, payment to the Contractor may be adjusted per General Prevailing Wage Rate provisions. Contractor Selection Date:April 1, 2025

Bid Results

Fire / Police

$201,481.00

Public - City

Site Work

15

8

7

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
50
Bidding Soon
717
All Active Projects
320
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

img_map_placeholder

Multiple Locations, Monterey, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rebid: Police and Fire Vehicle Gates

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.