BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Renovation of a medical facility in Blackfoot, Alberta. Completed plans call for the renovation of a medical facility.

The project generally consists of the general contracting, project costing, construction, and final site clean-up associated with the renovation of three areas within the Slim Thorpe Recovery Centre; reconfigure Resident Rooms 1050 and 1053a, retrofit current Office 1118 to a new Resident Room, and enlarge Office 1128 as shown on architectural plans.

Award

Medical

$144,900.00

Public - State/Provincial

Renovation

15

6

23

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

April 1, 2025

Project location map

21060 Tranquility Way, Blackfoot, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.