Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2025 at 8:00 PM
Updated March 25, 2025
Site work, paving and new construction of a civil project in Little Rock, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; and water / sewer project.
The Project consists, but is not limited to, the construction of Pump Station No. 17B. Construction of a new pump station capable of pumping safe drinking water from the Intermediate System pressure zone to the Highland Ridge pressure zone. Construction of a new building to house the proposed pumps and associated piping, valves, and electrical and mechanical equipment. Civil sitework yard piping, paving, and grading. Site electrical improvements to support the items above, including duct banks and control systems. All materials must be of domestic manufacture and in accordance with these standards. Foreign-made materials (i.e., pipe, fittings, tapping sleeves, valve boxes, etc.) are strictly prohibited. Bids will be received for a single prime contract. Bids shall be on a lump sum and unit price basis. Bids shall be accompanied by a cashier's or certified check upon a national or state bank in an amount of five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within fifteen (15) days after notice of award of Contract to him. Such bid guarantee shall be made payable to CENTRAL ARKANSAS WATER. The successful bidder must furnish a performance and payment bond, upon the form provided in the amount of one hundred percent (100%) of the contract price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner. Attorneys-in-Fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file with each Bond a certified and effective dated copy of the Power of Attorney. Attorneys-in- Fact that sign the Bonds must be licensed to conduct business in the State of Arkansas. Bids must remain in effect for60 days after the bid opening date. Within 60 days from the bid date, the Owner may award the contract to the lowest responsive, responsible bidder or reject any or all bids for the project. Successful Bidder must comply with the requirements of Arkansas Code Ann. 17-25-401-409 (1995)in accordance with the procedures established by the Contractors Licensing Board. The Central Arkansas Water reserves the right to reject any or all bids, to waive irregularities in the bids, and bidding deemed to be in the best interests of the Central Arkansas Water, and to reject nonconforming, nonresponsive, or conditional bids. Question Deadline 02/28/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than forty-eight (48) hours prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$3,494,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2025
April 3, 2025
28325 Chenal Valley Dr, Little Rock, AR
Related To This Project
Little Rock, AR
Bid Date: Feb 27 2025
Little Rock, AR
Bid Date: Feb 27 2025
Little Rock, AR
Bid Date: Feb 27 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Feb 27 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Feb 14 2025
Little Rock, AR
Bid Date: Feb 14 2025
Little Rock, AR
Bid Date: Feb 25 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Jul 07 2020
Little Rock, AR
--
Little Rock, AR
Bid Date: Feb 13 2025
Little Rock, AR
Bid Date: Feb 14 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
