Renovation of an educational facility in Winnetka, Illinois. Completed plans call for the renovation of a educational facility.
The general scope of work includes the replacement of existing interior domestic water mains and risers and installation of thermostatic mixing valves at existing plumbing fixtures. The scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: temporary facilities and controls, cutting and patching, selective demolition, unit masonry, penetration firestopping, non-structural metal framing, gypsum plastering, gypsum board, acoustical panel ceilings, interior painting, plumbing valves, hangers and supports for plumbing, plumbing identification, plumbing piping insulation, plumbing piping, and plumbing piping specialties. The work site is located at 385 Winnetka Avenue, Winnetka, IL 60093. The Subcontractors must achieve Substantial Completion for all work on or before Friday, August 15, 2025. Additional project schedule requirements will be included in the Bid Documents. Each bid must be accompanied by a Bid Bond in the amount of ten percent (10%) of the Base Bid made payable to New Trier Township High School District 203. Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening. Each successful Subcontractor will be required to furnish a Performance and Payment Bond for 100% of the final Contract Sum. It is anticipated that the contracts will be awarded by the Board of Education at the regular meeting on Monday, March 17, 2025. The Contractor will be required to submit electronic copies of their certified payrolls with each application for payment using the Illinois Department of Labor's Prevailing Wage Portal. The New Trier Township High School District 203 Board of Education reserves the right to accept or reject any or all bids, reject nonconforming bids, reject conditional bids, waive irregularities in the bidding procedures, or to accept any bid that, in its sole opinion, best serves the interests of the School District.
Post-Bid
Educational
$150,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
April 7, 2025
385 Winnetka Ave, Winnetka, IL
Related To This Project
Winnetka, IL
Bid Date: Mar 04 2025
Winnetka, IL
Bid Date: Mar 06 2025
Winnetka, IL
Bid Date: Mar 06 2025
Winnetka, IL
Bid Date: Mar 28 2025
Winnetka, IL
Bid Date: Apr 11 2025
Winnetka, IL
Bid Date: Apr 22 2025
Winnetka, IL
Bid Date: May 08 2025
Winnetka, IL
Bid Date: May 27 2025
Winnetka, IL
Bid Date: Jun 17 2025
Winnetka, IL
Bid Date: Feb 25 2025
Winnetka, IL
Bid Date: Jan 30 2025
Winnetka, IL
Bid Date: Feb 21 2025
Winnetka, IL
Bid Date: Feb 06 2025
Winnetka, IL
Bid Date: Jan 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.