BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

This is a service / maintenance or supply contract in Woodstock, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 25, 2025, at 8:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for the subject project. Work includes, but is not limited to, roadway widening and reconstruction of Illinois 47 with three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Avenue. The proposed roadway will provide two lanes in each direction separated by an 18-foot raised median and a closed drainage system throughout the limits of this roadway section. Other proposed improvements include pavement resurfacing, side roads reconstruction, retaining wall construction, erosion control and protection, utility relocation of existing storm sewers, sanitary sewer, water main, and existing ditches, special waste excavation, earth excavation and embankment, removal of existing improvements, miscellaneous pipe culverts and storm sewers, pavements, pavement marking and signage, overhead sign structures, streetscape enhancements, roadway lighting and traffic signal. Judd St, Irving Ave, McConnell Rd, Country Club Rd, and IL 120 will require partial closures and detours to facilitate reconstruction of the IL Route 47 intersections, including full reconstruction of all five roadways, any and all incidental and collateral work necessary to complete the project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. The anticipated construction completion date is October 31, 2028. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 01 - RFP - IL 47 from N of IL 120 (McHenry Ave) to US 14, Phase III Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
294
Bidding Soon
3,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

Project location map

IL-47, Woodstock, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.