Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 16, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a mixed-use development in Dothan, Alabama. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.
**As of April 16 , 2025, this project has not yet been awarded. A timeline for award has not yet been established. PRE-QUALIFICATION PROPOSALS in three (3) hard copies and one (1) digital copy on USB flash drive will be received by the Owner, to the attention of Weston Glover, at the Dothan City General Services Building at 288 Complex Drive, Dothan, AL 36303, for the below mentioned project, until 4:00 PM Central Time, Thursday, February 20, 2025. The project consists of: The design of the Dothan Pickleball Complex is composed of 24 tournament-compliant pickleball courts, 1 tournament-compliant championship court, a small utility structure composed of CMU wall construction with a cementitious exterior, and the renovation and inclusion of ADA-compliant modifications to the restrooms within the existing Pittman Building. This design requires the demolition of existing tennis courts, demolition of the maintenance shop, and the removal of asphalt in portions of the existing parking lot. The incorporation of varying numbers of covered courts and the addition of a covered, open-air locker area and equipment vending may be incorporated via accepted alternates. General Contractors will be notified of pre-qualification to bid on or before Thursday, March 6, 2025, at which time plans will be available for distribution per the above requirements. Clarification Deadline 3/26/2025 5:00 PM All Bid Process questions should be addressed to Thad Taylor, purchasing@dothan.org, (334) 615-3154. Post all questions on line under clarifications. The answers will be emailed to you. All questions, comments and requests for clarifications or additional information shall be submitted in writing to Project Architect Samantha King, at CDFL Architects + Engineers PA. Any and all comments, questions and requests for clarification must be received Scope of work will include the demolition of the existing tennis courts and maintenance shop, and new construction of the following: 24 tournament-compliant pickleball courts, 1 tournamentcompliant championship court, a small utility structure, and the renovation and inclusion of ADA-compliant modifications to the restrooms within the existing Pittman Building. The new construction courts and adjacent walkways cover roughly 73,764 square feet on the site. Fencing, netting, and landscaping are included within the site work. The slabs beneath the courts will consist of a 5" thick, virtually jointless, post-tensioned slab. Utility work includes the relocation of existing powerlines to be underground. New electrical services will be installed within the utility structure. LED lighting will be incorporated for both exterior and interior fixtures. Communications will be incorporated according to Owner specifications. Special systems will include CCTV and Sound/PA throughout the Pickleball Complex. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated budget between $3,000,000-$5,000,000
Post-Bid
Playgrounds / Parks / Athletic Fields
$5,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
May 1, 2025

1603 Stadium St, Dothan, AL
Related To This Project
Dothan, AL
Bid Date: Feb 18 2025
Dothan, AL
Bid Date: Mar 04 2025
Dothan, AL
Bid Date: Mar 04 2025
Dothan, AL
Bid Date: Apr 08 2025
Dothan, AL
Bid Date: Apr 22 2025
Dothan, AL
Bid Date: Apr 15 2025
Dothan, AL
Bid Date: May 09 2025
Dothan, AL
Bid Date: Apr 22 2025
Dothan, AL
Bid Date: Feb 18 2025
Dothan, AL
Bid Date: Feb 05 2025
Dothan, AL
Bid Date: Jan 28 2025
Dothan, AL
Bid Date: Jan 28 2025
Dothan, AL
Bid Date: Feb 11 2025
Dothan, AL
--
Dothan, AL
Bid Date: Dec 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.