BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 1, 2025

Site work and paving for a civil project in Statesboro, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of APRIL 30, 2025 , this project has been awarded to Ellis Wood Contracting, awarded amount not available.** The City of Statesboro requests proposals for a project consisting of roadway improvements along Max Lockwood Drive from SR 67/Fair Road to S. Zetterower Ave. This work will include reconfiguring the road to a one-way thoroughfare, installing traffic calming measures, ensuring all private drives along the roadway conform to standard commercial driveways, and installing of a new storm pipe network to improve drainage. Additionally, the project requires adding an entrance from Fair Road to the Statesboro/Bulloch County Parks and Recreation parking lot adjacent to SR 67/Fair Road. Work will include but is not limited to the following: clearing, excavating, setting grade, installing subgrade materials, paving, concrete forming, concrete pouring, concrete pipe installation, grading and dressing of job site, and traffic striping. Question Deadline 03/08/2025 Any Request for Information (RFIs) concerning this bid request shall be made in writing to Darren Prather, darren.prather@statesboroga.gov or at P.O Box 348, Statesboro, GA 30459, no later than five (5) calendar days before the bid due date

Award

Roads / Highways

$353,000.00

Public - City

Paving, Site Work

74

3

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
65
Bidding Soon
731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

Project location map

Max Lockwood Dr, Statesboro, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.