Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
This is a service / maintenance or supply contract in Channahon, Illinois. Contact the soliciting agency for additional information.
This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 22, 2025, at 10:30 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required to provide I-55 safety and operational improvements between the interchanges of IL 53 and I-355. The I-55 roadway will be widened between IL 53 and I-355 to construct one auxiliary lane in each direction where the existing outside shoulder is currently located. The proposed geometry for the improvements is three 12' foot lanes in each direction, a 12' auxiliary lane in each direction, 6' inside shoulder, 10' outside shoulder, and guardrails and retaining walls where necessary in each direction on I-55. Noise abatement wall solicitation will occur in Phase II. An open drainage system using drainage ditches outside the edge of pavement is recommended for this project. The existing open drainage system outside the mainline pavement will be maintained with minimal changes to the ditches. Minimal changes include modifying the ditch foreslopes to accommodate the proposed widening. Otherwise, the grades of the drainage system will be maintained. The additional pavement for the auxiliary widening will drain to this open drainage system. At the southwest end of the project, approximately 900' of RCP relief storm sewer will be installed along the south side of the Frontage Road. The existing enclosed drainage system for the median and center lanes and the existing outfalls for the drainage will remain unchanged. Roadway lighting is provided throughout the project limits. Six light poles within the project area will need to be relocated due to roadway widening for the auxiliary lanes. The completion date for this contract will be 24 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Highways (Freeways) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 02 - RFP - FAI 55 (I-55) from I-355 to IL 53, Phase II Project
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
I-55, Channahon, IL
Related To This Project
Channahon, IL
Bid Date: Mar 12 2025
Channahon, IL
Bid Date: Feb 14 2025
Channahon, IL
Bid Date: Apr 23 2025
Channahon, IL
Bid Date: Apr 24 2025
Channahon, IL
Bid Date: Apr 24 2025
Channahon, IL
Bid Date: May 07 2025
Channahon, IL
Bid Date: Jul 16 2025
Channahon, IL
Bid Date: Jul 16 2025
Channahon, IL
Bid Date: Feb 10 2025
Channahon, IL
--
Channahon, IL
Bid Date: Dec 05 2024
Channahon, IL
--
Channahon, IL
Bid Date: Oct 17 2024
Channahon, IL
Bid Date: Oct 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
