BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

This is a service / maintenance or supply contract in Dixon, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 1, 2025, at 1:30 PM at the Region Two/District Two Office in Dixon. Phase I and/or II engineering services are required for various projects throughout District Two and will report to the District's Geometrics Engineer. This project will have an emphasis on geometric work; however, any Phase I and II activities may be performed. The Phase I work may consist of conducting route surveys, land surveys, hydraulic surveys, hydraulic analyses, geometric studies, and preparing Project Reports anticipated to be Categorical Exclusions. This work may include data collection, development of alignment alternatives, cost estimates, ADA, traffic management analysis, crash analyses, Type, Size and Location (TS&L) drawings, geotechnical services, bridge inspections, bridge condition reports (BCRs), structure plans, public involvement activities, environmental tasks, surveys, ROW documents and other related work and prepare exhibits necessary to produce the Project Report. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. The completion date for this contract will be 60 months after authorization to proceed. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 19 - RFP - Various Phase I/II Projects, Various Routes

Conceptual

Sidewalks / Parking Lot

$2,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
64
Bidding Soon
986
All Active Projects
395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.