Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
This is a service / maintenance or supply contract in Dixon, Illinois. Contact the soliciting agency for additional information.
This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 24, 2025, at 1:30 PM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for various projects in District Two. The Consultant must provide sufficient staff to perform all engineering services required to complete the projects. The projects may include construction inspection, documentation of pay quantities and related forms for record keeping, Construction & Materials Management System (CMMS) documentation, on-site quality assurance material testing, night-time inspection as needed, and all other work required to complete the projects. The Consultant will be responsible to ensure contractors complete the work in accordance with the plans and specifications. It is anticipated the department will do all off-site material inspection for the project, and the Consultant will do all onsite material inspection including PCC QA testing as needed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. The completion date for this contract will be 60 months after authorization to proceed. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 27 - RFP - Various Phase III Projects, Various Routes
Conceptual
Bridges / Tunnels
$4,250,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
Multiple Locations, Dixon, IL
Related To This Project
Dixon, IL
Bid Date: Mar 07 2025
Dixon, IL
Bid Date: Feb 24 2025
Dixon, IL
Bid Date: Apr 09 2025
Dixon, IL
Bid Date: Feb 20 2025
Dixon, IL
Bid Date: Mar 14 2025
Dixon, IL
Bid Date: Feb 10 2025
Dixon, IL
Bid Date: Jan 21 2025
Dixon, IL
Bid Date: Jan 16 2025
Dixon, IL
Bid Date: Oct 14 2020
Dixon, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
