Published February 4, 2025 at 7:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Ottawa, Illinois. Contact the soliciting agency for additional information.
This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 23, 2025, at 9:00 AM at the Region Two/District Three Office in Ottawa. Phase I/II engineering services are required for various projects throughout District Three. Phase I engineering studies, if required, may consist of conducting route surveys, land surveys, hydraulic analysis and reports, geometric studies, environmental studies, safety studies including crash analyses, preparing project reports, and reviewing geotechnical reports. This work may include data collection, development of alignment alternatives, cost estimates, traffic management analysis, crash analysis, bridge condition reports, TS&L drawings, and other related work and exhibits necessary to complete the Phase I preliminary engineering. Phase II work, if required, may consist of, data collection, conducting route surveys land surveys, hydraulic analysis, geometric studies, structure plans, roadway plans, and any other related work to complete final plans and specifications, as necessary. The Consultant staff should further be knowledgeable in ADA/PROWAG requirements. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. The estimated engineering fee for this project is $2,500,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 31 - RFP - Various Phase I/II Projects, Various Routes
Conceptual
Bridges / Tunnels
$2,500,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025

Multiple Locations, Ottawa, IL
Related To This Project
Ottawa, IL
Bid Date: Feb 05 2025
Ottawa, IL
Bid Date: Feb 19 2025
Ottawa, IL
Bid Date: Mar 04 2025
Ottawa, IL
Bid Date: Mar 18 2025
Ottawa, IL
Bid Date: Mar 19 2025
Ottawa, IL
Bid Date: Mar 19 2025
Ottawa, IL
Bid Date: Mar 19 2025
Ottawa, IL
Bid Date: Feb 25 2021
Ottawa, IL
Bid Date: Jan 15 2025
Ottawa, IL
Bid Date: Jan 16 2025
Ottawa, IL
--
Ottawa, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.