Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
This is a service / maintenance or supply contract in Paris, Illinois. Contact the soliciting agency for additional information.
This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 30, 2025, at 10:00 AM at the Region Three/District Five Office in Paris. Phase I/II engineering services are required for the preparation of a project report and final contract plans, specifications, and cost estimates for the 3P Standard Overlay and ADA Improvements of FAP 332 (US 150/US 136/ILL 1) from 0.2 Miles North of Liberty Lane to Vermilion River in Danville in Vermilion County. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 60 months after authorization to proceed. A planned Supplement for Phase II will be done near the completion of Phase I. The project is tentatively planned for the November 2028 Letting The estimated construction cost for this project is $4,700,000. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 39 - RFP - US 150/US 136/ILL 1 from 0.2 Mi. N. of Liberty Lane to Vermilion River in Danville, Phase I/II Project
Conceptual
Roads / Highways
$4,700,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
Multiple Locations, Paris, IL
Related To This Project
Paris, IL
Bid Date: Mar 21 2025
Paris, IL
Bid Date: May 05 2025
Paris, IL
Bid Date: Jun 06 2025
Paris, IL
Bid Date: Jun 13 2025
Paris, IL
Bid Date: Jun 13 2025
Paris, IL
Bid Date: Jun 03 2025
Paris, IL
Bid Date: Mar 07 2025
Paris, IL
Bid Date: Mar 12 2025
Paris, IL
Bid Date: Dec 23 2024
Paris, IL
--
Paris, IL
Bid Date: Oct 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
