BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Paris, Illinois. Contact the soliciting agency for additional information.

This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 30, 2025, at 10:00 AM at the Region Three/District Five Office in Paris. Phase I work which may consist of conducting hydraulic and route surveys, subsurface utility engineering, preparing Structure Geotechnical Reports, drilling and analysis of soil borings, hydraulic analysis, geometric studies, and preparing project reports (Categorical Exclusion reports only). This work may include data collection, development of alignment alternatives, cost estimates, traffic management analysis, traffic management plans, crash analysis, quantity computations, and other related work items required to produce a project report. Phase II work may consist of conducting route surveys, land surveys, right-of-way plat and plan preparation, writing legal descriptions, staking right-of-way, hydraulic analysis, geometric studies, roadway plans, highway lighting, traffic signal design, TS&L drawings, pre-final structure plans, final structure plans, and any related work required to complete final plans, special provisions, estimates, and 3D model as necessary. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed. The method of contractor selection has not been determined at this time. IL DOT - 40- RFQ - Various Phase I/II Projects, Various Routes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
78
Bidding Soon
890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

Multiple Locations, Paris, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.