EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work for a sidewalk / parking lot in Whittier, California. Completed plans call for site work for a sidewalk / parking lot.

As of May 29, 2025, the project was awarded to R Dependable Const. INC., with an awarded amount of 1,954,000 Prequalification of Bidders As a condition of submitting a bid for this Project, and in accordance with California Public Contract Code section 20111.6, prospective bidders are required to submit to the District a completed set of prequalification documents on forms provided by the District. These documents will be the basis for determining which bidders are qualified to bid on this Project. Bids will not be accepted if a Contractor has not been prequalified where prequalification is required. Prequalification documents are available from the District Website at 7211 South Whittier Ave., Whittier, CA 90602, (562) 789-3000 . Prequalification documents must be submitted by February 14, 2025 at 11:00 a.m. Contractors will be notified by telephone, fax or by mail of their prequalification rating within a reasonable period of time after submission of their prequalification documents, but not less than five business days prior to the bid opening date. If this Project includes work that will be performed by mechanical, electrical or plumbing (MEP) subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C- 46 licenses), such MEP subcontractors must also be prequalified. A list of prequalified MEP subcontractors will be made available by the District to all bidders at least five business days prior to the bid opening date. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid. This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above. Each bidder and its designated subcontractor(s) shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the contract documents. The successful bidder must possess a valid and active Class "A" or "B" License at time of award of contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. The Contractor and all subcontractor (of any tier) must be currently registered and qualified to perform public work in accordance with Labor Code section 1725.5. The Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Unless specifically exempted by the Labor Commissioner for this Project, monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Each bidder shall submit with his bid, on the form furnished with the contract documents, a list of the designated subcontractors on this project as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Sections 4100 et seq . In accordance with California Public Contract Code Section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the District, or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the Contractor. Upon satisfactory completion of the contract, the securities shall be returned to the Contractor. Each bidder's bid must be accompanied by one of the following forms of bidder's security in an amount not less than ten percent (10%) of the total bid price: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the District in the form set forth in the contract documents. Pursuant to California Labor Code Sections 1720 et seq ., it shall be mandatory upon the Contractor to whom the contract is awarded, and upon any subcontractor under such Contractor, to pay not less than the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the contract, including holiday and overtime work as well as employer payments for health and welfare, pension, vacation, and similar purposes. No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids. Separate payment and performance bonds, each in an amount equal to 100% of the total contract amount, are required, and shall be provided to the District prior to execution of the contract and shall be in the form set forth in the contract documents. All bonds (bid, performance and payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120. Any additive or deductive alternates to the base bid used to determine the lowest bid will be considered using the method specified in the Notice Inviting Bids set forth in the Contract Documents and in accordance with Public Contract Code section 20103.8. Each bidder must strive to meet goals and requirements relating to participation by Disabled Veteran Business Enterprises (D.B.V.E.), of three percent (3%) participation, established by the District, or make a good faith effort in respect thereto and provide the District with a report as to the actual participation at the conclusion of the Project. Any request for substitutions pursuant to Public Contracts Code Section 3400 must be made on the form set forth in the contract documents and included with the bid. Question Deadline 02/24/2025 at 11:00 AM PT ALL QUESTIONS REGARDING THIS PROJECT MUST BE ADDRESSED TO THE ARCHITECT, ATTENTION EDGAR PAZ, ARCHITECTS MSP 562-427-5007; E-MAIL REQUESTS FOR INFORMATION AT epaz@architectsMSP.com (copy to laura.romero111@gmail.com , OR AT FAX # 562-427-3007.

Award

Sidewalks / Parking Lot

$1,954,000.00

Public - State/Provincial

Site Work

18

12

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Scheduling of Work, Periodic Work Observation, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Pruning, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Athletic and Recreational Surfacing, Synthetic Running Track Surfacing, Planting, Planting Preparation, Soil Preparation, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
117
Bidding Soon
2,166
All Active Projects
858
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 1, 2025

img_map_placeholder

Multiple Locations, Whittier, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.