Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work for a civil project in San Jacinto, California. Completed plans call for site work for a water / sewer project.

Online Q&A Q&A Deadline 03/03/2025 10:00 AM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value 6,000,000 Start/Delivery Date April 1, 2025 or after contract is finalized Project Duration 400 Working Days Provide all labor, equipment, materials, and resources necessary for site improvements at the Grand Well and Treatment Plant. Install the potable water treatment plant supplied by the City and outfit the existing Grand Well in accordance with the provided plans and specifications. No overnight closures will be allowed. Access to existing homes and businesses shall be maintained at all times Project Scope Summary a. New Grand Well Pump and Well Motor i. Well pump concrete pedestal ii. Well motor and shaft/bowl installation iii. Aboveground and underground Piping iv. Pump to waste control valve v. Well starter testing vi. Disinfection and Testing b. Sludge drying pit enlargement i. Removal of existing wall ii. Construction of new retaining c. Grand Reservoir Inlet and Outlet upgrades i. Additional Inlet and retrofitting existing Red Valve/passive mixer ii. Flexible outlet retrofitting iii. Replace the overflow and drainpipe and add drainage catch basin d. New Treatment System i. Pre-purchased Pureflow treatment system 1. Vessels a. In/out headers and control valves b. Control panel c. Backwash pumps d. Decanted backwash return pumps e. Sludge management system/pump 2. Chemical pumps/controls a. Sodium hypochlorite dual wall bulk storage tank b. Ferric Chloride dosing and storage e. Contractor provided equipment/materials i. Steel building and foundation to house new treatment system 1. Treatment system area 2. Restroom 3. Electrical MCC room (climate controlled) ii. FRP chemical storage shed and foundation iii. Welded steel backwash water tank and foundation iv. Motor control center (MCC) v. Site power generator vi. Above and below grade process piping to/from prepurchased equipment vii. Concrete support pads for prepurchased equipment viii. Yard electrical and SCE coordination ix. Solar power conduit and connections x. Connection to existing well discharge piping xi. Civil improvements 1. Grading with 3" gravel after completion of the project. 2. Concrete landings/walkways f. Demolition of Existing Facilities/Equipment i. Existing treatment system (protect in place ex building) ii. Existing backwash tank iii. Existing electrical and other equipment support pads iv. Below grade piping and electrical g. Coordination with site operations i. Existing water distribution system pumps and storage tank

Award

Water / Sewer

$8,091,700.00

Public - City

Site Work

108

64

42

7

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 7, 2025

Project location map

910 Industrial Way, San Jacinto, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.