Published March 14, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Toms River, New Jersey. Completed plans call for site work for a transportation facility.

The purpose of this bid package is to provide the County of Ocean with a Contractor who will perform the work described and specified herein. Question submissions were received until Thursday, March 6, 2025 at 5:00 P.M. Construct Box Hangar and Taxilane Modifications- The proposed project generally includes the construction of a 6-bay box hangar and expansion of the existing adjacent taxilane (an additional 1,400 SY of bituminous pavement). The scope of this project includes construction of a 6-bay pre-fabricated box hangar, full depth pavement removal, full depth pavement construction, construction of a water quality pre-treatment basin to conform with current NJDEP requirements, modifications to the existing stormwater collection system, relocation of taxilane edge lights, airfield marking, construction of a vegetative swale, seeding, mulching, site grading, and clearing and grubbing. Safety, maintaining aircraft operations, and construction costs are all interrelated. Since safety must not be compromised, the Airport Owner must strike a balance between maintaining aircraft operations and construction costs. This balance will vary widely depending on the operational needs and resources of the airport and will require early coordination with airport users and the FAA. As the project design progresses, the necessary construction locations, activities and associated costs will be identified. As they are identified, their impact to airport operations must be assessed. Adjustments are made to the proposed construction activities, often by phasing the project and/or to airport operations in order to maintain operational safety. This planning effort will ultimately result in a project CSPP. The development of the CSPP takes place through the following five steps: a. Identify Affected Areas b. Describe Current Operations c. Allow for Temporary Changes to Operations d. Take Required Measures to Revise Operations e. Manage Safety Risk

Post-Bid

Transportation Terminals

$280,000.00

Public - County

Site Work

39

23

19

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Access Roads, Haul Routes, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Stressing Tendons, Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders, Roofing and Siding Panels, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Flooring, Flooring Treatment, Wood Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies, Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Obstruction Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
245
Bidding Soon
4,283
All Active Projects
1,954
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 24, 2025

img_map_placeholder

101 Hooper Ave, Toms River, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct Box Hangar and Taxilane Modifications

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.