EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Hayward, California. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

The City of Hayward is seeking a contractor to provide roadway striping per this Request for Quote (RFQ) specifications. Estimated quantities of striping materials are provided in Attachment A. Any materials needed beyond initial estimates will be purchased at the unit prices provided in the initial bid. Question Submission Deadline :February 19, 2025, 5:00pm Question Response Deadline: February 26, 2025, 5:00pm Contact Information Lucas Woodward Senior Transportation Engineer 777 B Street 2nd Floor Hayward, CA 94541 Email: lucas.woodward@hayward-ca.gov Phone: (510) 583-4783 Selection of Firm or Individual (Tentative):March 12, 2025 As part of a pilot project to calm traffic and increase the vitality of Downtown Hayward, the City of Hayward is replacing one travel lane on Mission Boulevard between A Street and D Street with a lane devoted to parking and painted bulb-outs. The project is expected to result in an enhanced walking environment, lower traffic speeds on Mission Boulevard, and convenient parking for customers and employees of downtown businesses. The project consists of the installation of colored paint, striping, and flexible delineators per Attachment B. The qualified contractor is expected to furnish and install specified materials per the plan set provided by the City. Materials include white thermoplastic striping, purple thermoplastic with reflective glass beads, FG300 posts, and signage. Work items should comply with City standard plans and specifications, OSHA, ADA, Caltrans, and CA MUTCD requirements. The contractor should submit a traffic control plan for the jobsite and provide all temporary traffic control devices and jobsite security. The work site should be kept neat, tidy, and passable. The entire work shall be diligently prosecuted to Project Substantial Completion before the expiration of TWENTY-FIVE (25) WORKING DAYS beginning on the first working day charged as shown in the Notice to Proceed (i.e., beginning on the following Monday) and ending on Project Substantial Completion. Project Final Completion shall be completed within FIVE (5) WORKING DAYS from Substantial Completion. (Said 25 WORKING DAY and 5 WORKING DAY periods, collectively, referred to as the Contract Time.) Substantial Completion Liquidated Damages: The Contractor shall pay to the City of Hayward the sum of $1,000 per day in excess of the number of working days prescribed above, for each and every CALENDAR DAY's delay in achieving Project Substantial Completion.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Site Work

9

8

4

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
105
Bidding Soon
1,853
All Active Projects
879
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

img_map_placeholder

Mission Blvd, Hayward, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mission Blvd Lane Removal Pilot Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.