Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 4, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Exton, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The project involves but is not limited to: road milling and delivery / placement of Superpave Warm Mix Asphalt Wearing Course, 9.5 mm mix, 1-1/2-inch compacted depth for various roads in the township, including base repair. Questions Due Date: Mar 3rd 2025, 2:00 PM EST online question deadline 1 LS Maintenance and Protection of Traffic 2. 4,000 LF 4" Double Yellow Waterborne Pavement Markings 3. 8,000 LF 4" Single White Waterborne Pavement Markings Provide all necessary traffic controls for complete project. Contractor shall place a sign at each end of the project site detailing the start & end dates a minimum of 5 days prior to the start of work. Saw cut / mill pavement joints (all locations including driveways if applicable). Full width milling 1-1/2 inches minimum depth. Mill additional depth, if necessary. (See following pages) Contractor shall adjust all water valves if necessary with adjustment rings provided by the Township. Complete Base Repair as directed by the Township representative.(See procedure on the following pages). Sweep and Tack Coat roadway surface prior to paving. Deliver and place Leveling Course as directed by the Township representative. Deliver and place 1-1/2 inches of Wearing Course. Sealing of all joints, edges and utilities is incidental to paving. Paint 4" double yellow, and 4" single white waterborne pavement markings on Taylor Road. Alternate Bid #2: Removal of temporary stone base to a depth of 4". 2.5" Binder Course 1.5" Wearing Course Base Bid Roadways: Taylor Road - From Peck Road to Spring Run Lane - full road width. Approximate length = 4,405'. Approximate road width = 25'. Approximate total area = 12,191 square yards. Base Repair estimate = 1,000 square yards. Full Width Milling estimate = 12,191 square yards. Alternate Bid #1 Roadways: Dublin Drive - From Taylor Road to Cul-De-Sac - full road width. Approximate length = 1,550' Approximate road width = 30'. Approximate total area = 5,921 square yards. Full Width Milling estimate = 5,921 square yards. Plank Lane - From Taylor Road to Dublin Drive - full road width. Approximate length = 338'. Approximate road width = 30'. Approximate total area = 1,172 square yards. Full Width Milling estimate = 1,172 square yards. Combined Base Repair estimate = 500 square yards.
Post-Bid
Roads / Highways
$200,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 04 - Masonry
Division 09 - Finishes
Division 32 - Exterior Improvements
Division 34 - Transportation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
June 16, 2025
Multiple Locations, Exton, PA
Related To This Project
Exton, PA
--
Exton, PA
--
Exton, PA
--
Exton, PA
Bid Date: Feb 14 2025
Exton, PA
Bid Date: Feb 06 2025
Exton, PA
Bid Date: Jan 28 2025
Exton, PA
--
Exton, PA
--
Exton, PA
Bid Date: Jun 25 2020
Exton, PA
Bid Date: May 14 2024
Exton, PA
Bid Date: Apr 25 2024
Exton, PA
Bid Date: Apr 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.